Grant: Collaborative Research and Development Grants
University of Toronto
$367,180.00
Battery-Enabled EV Fast -Charging Station
FY 2018-19
Summary
The salient barrier to large-scale EV adoption is ""range anxiety"", i.e., i) long charging time, ii) relatively small*range of distance coverage per charge iii) and lack of necessary or readily-accessible charging infrastructure,*particularly in rural areas. The most common used EV chargers are levels-1 and level-2 charges which take up*to 8 hours to fully charge the EV's batteries and are not suited for use during long-distance travel. Level-3 (fast)*chargers that take 20-25 minutes for charging are the next step in the evolution of EV chargers and enable*long-distance/rural EV travel. This collaborative industry-university proposal by eCAMION and the University*of Toronto is to research, develop, test and install prototypes of EV fast-charging (level-3) stations that utilize*grid-level Li-ion battery as the main source to supply multiple DC fast-chargers. The envisioned charging*station, within the next three-years, is primarily intended for installation in rural area, e.g., along Tans-Canada*Highway and other main transportation corridors, to address ""range anxiety"" for EV's long-range and/or rural*travel. In contrast to the existing EV fast-chargers, the proposed technology neither requires high-capacity*utility-feed nor results in power quality issues in the utility grid. These two features enable installation of the*charging station based on demand and market requirements and eliminates the need for i) access to*high-capacity utility feeder or ii) feeder up-grade which can impose excessive cost. The battery module of the*charging station is charged i) gradually from the grid and/or ii) local renewable resources, i.e., solar-PV units,*and thus further reduces GHG emission and cost of operation. This program focuses on:*1- RD&D of i) control, protection and Power/Energy management software/hardware of the battery-enabled*fast charging station and ii) charging station infrastructure using Si-based power electronic converter modules*for charging unit and station battery operation, for applications within 2nd-3rd year of the project. 2- RD&D of*next-generation fast-charging station based on i) enhanced version of the developed control system and ii)*SiC-based power electronic converter modules for applications beyond the 3rd-year of this project.
Program
Collaborative Research and Development Grants
Recipient
Location
Ontario, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
509316-2017
Name nom
Iravani, Reza
Department département
Electrical & Computer Engineering, Edward S. Rogers Sr. Department of
Organization id
31
Institution établissement
University of Toronto
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2018
Competition year année de concours
2017
Award amount
367180
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
305
Area of application group en
Energy resources
Area of application group fr
Ressources d'énergie
Area of application en
Energy storage and conversion
Area of application fr
Stockage et transformation de l'énergie
Research subject code
2516
Research subject group en
Electrical and electronic engineering
Research subject group fr
Génie électrique et électronique
Research subject en
Energy conversion and distribution
Research subject fr
Conversion et distribution de l'énergie
Partie
2
Nb partie
2
Application title
Battery-Enabled EV Fast -Charging Station
Keyword
NSERC
Application summary
The salient barrier to large-scale EV adoption is ""range anxiety"", i.e., i) long charging time, ii) relatively small*range of distance coverage per charge iii) and lack of necessary or readily-accessible charging infrastructure,*particularly in rural areas. The most common used EV chargers are levels-1 and level-2 charges which take up*to 8 hours to fully charge the EV's batteries and are not suited for use during long-distance travel. Level-3 (fast)*chargers that take 20-25 minutes for charging are the next step in the evolution of EV chargers and enable*long-distance/rural EV travel. This collaborative industry-university proposal by eCAMION and the University*of Toronto is to research, develop, test and install prototypes of EV fast-charging (level-3) stations that utilize*grid-level Li-ion battery as the main source to supply multiple DC fast-chargers. The envisioned charging*station, within the next three-years, is primarily intended for installation in rural area, e.g., along Tans-Canada*Highway and other main transportation corridors, to address ""range anxiety"" for EV's long-range and/or rural*travel. In contrast to the existing EV fast-chargers, the proposed technology neither requires high-capacity*utility-feed nor results in power quality issues in the utility grid. These two features enable installation of the*charging station based on demand and market requirements and eliminates the need for i) access to*high-capacity utility feeder or ii) feeder up-grade which can impose excessive cost. The battery module of the*charging station is charged i) gradually from the grid and/or ii) local renewable resources, i.e., solar-PV units,*and thus further reduces GHG emission and cost of operation. This program focuses on:*1- RD&D of i) control, protection and Power/Energy management software/hardware of the battery-enabled*fast charging station and ii) charging station infrastructure using Si-based power electronic converter modules*for charging unit and station battery operation, for applications within 2nd-3rd year of the project. 2- RD&D of*next-generation fast-charging station based on i) enhanced version of the developed control system and ii)*SiC-based power electronic converter modules for applications beyond the 3rd-year of this project.