Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Engage Grants Program

University of British Columbia

$25,000.00

Seepage analysis of right abutment of sugar lake dam

FY 2018-19

Summary
BC Hydro's Sugar Lake Dam is located on the Shuswap River approximately 70 km east of Vernon, BC. The*dam provides storage and flow regulation for hydroelectricity production at the Shuswap Falls generating*station, located at the Wilsey Dam, 29 km downstream on the Shuswap River. Dam safety is a critical*component of the production of hydroelectricity. The Sugar Lake Dam experiences unexpected seasonally*fluctuating seepage through both abutments that requires a more comprehensive understanding to ensure*continued safe operation of the dam.*While seepage around and underneath dams is a normal phenomenon, operators of dams must be vigilant for*seepage conditions that can cause internal erosion in the dam abutments or the dam itself as internal erosion*leading to piping is a common failure mode for dams. Therefore, a strong understanding of the influence of the*geological and geometric conditions on the seepage conditions is needed so that unusual conditions can be*promptly identified and managed.*The proposed research aims to (1) assemble existing data on the bedrock and surficial geology and the*geometry of the dam and its foundations, (2) collect new data using a UAV and photogrammetry-based*mapping, and (3) use the data to create and calibrate a 3D numerical seepage model for BC Hydro that can*simulate transient seepage analyses.
Program
Engage Grants Program
Location
British Columbia, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
533147-2018
Name nom
Tannant, Dwayne
Department département
Okanagan - Engineering, School of
Organization id
2
Institution établissement
University of British Columbia
Province en
British Columbia
Province fr
Colombie-Britannique
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2018
Competition year année de concours
2018
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1554
Committee name en
Pacific Internal Decision Committee
Committee name fr
Comité de décision interne pour le Pacifique
Area of application code
300
Area of application group en
Energy resources
Area of application group fr
Ressources d'énergie
Area of application en
Energy resources (including production, exploration, processing, distribution and use)
Area of application fr
Ressources d'énergie (production, exploration, traitement, distribution et utilisation de l'énergie)
Research subject code
1002
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Geotechnical engineering (including engineering geology)
Research subject fr
Géotechnique (y compris génie géologique)
Partie
1
Nb partie
1
Application title
Seepage analysis of right abutment of sugar lake dam
Keyword
NSERC
Application summary
BC Hydro's Sugar Lake Dam is located on the Shuswap River approximately 70 km east of Vernon, BC. The*dam provides storage and flow regulation for hydroelectricity production at the Shuswap Falls generating*station, located at the Wilsey Dam, 29 km downstream on the Shuswap River. Dam safety is a critical*component of the production of hydroelectricity. The Sugar Lake Dam experiences unexpected seasonally*fluctuating seepage through both abutments that requires a more comprehensive understanding to ensure*continued safe operation of the dam.*While seepage around and underneath dams is a normal phenomenon, operators of dams must be vigilant for*seepage conditions that can cause internal erosion in the dam abutments or the dam itself as internal erosion*leading to piping is a common failure mode for dams. Therefore, a strong understanding of the influence of the*geological and geometric conditions on the seepage conditions is needed so that unusual conditions can be*promptly identified and managed.*The proposed research aims to (1) assemble existing data on the bedrock and surficial geology and the*geometry of the dam and its foundations, (2) collect new data using a UAV and photogrammetry-based*mapping, and (3) use the data to create and calibrate a 3D numerical seepage model for BC Hydro that can*simulate transient seepage analyses.