Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Engage Grants Program

Concordia University

$25,000.00

Capacity planning model for a cabinetry manufacturing company

FY 2017-18

Summary
One of the main challenges that Essence Cabinets in particular and the offsite construction domain in generalare facing is a production capacity problem. This includes gaining knowledge of the number of product typesthat can be produced in a given time span and the number of resources available in a given production system.A better understanding of the production capacity available, as well as the capacity required for each producttype, will empower the industry partner to optimize resource allocation, leading to improved time efficiencydue to higher resource utilization, and to satisfy due dates for each job. This research will be carried out in sixstages in order to analyze and streamline the production line, identify production bottlenecks, and determine aproduction capacity model: (1) study historical data to establish cabinetry system of systems; (2) benchmark theexisting production process; (3) develop a comprehensive simulation model of the production line; (4)determine the available production capacity; (5) develop KPIs for measuring the man-hour requirements perproduct type; and (6) establish a strategy for future research and development. Opportunities for developing adrafting and design tool for kitchen cabinets will be explored, aiming to help the industry partner to maximizeits resources. The highly qualified personnel working on this project will gain both direct industry experienceand theoretical expertise in the areas of lean, data analysis, construction planning, simulation, and projectmanagement techniques in the course of this project. In terms of benefits to Canada, one of the most commonchallenges that construction manufacturers face is capacity planning, which includes gaining better insight intothe maximum number of product types that can be produced in a specific mix, in a given time span, andconsidering available resources. The Canadian modular manufacturing industry thus stands to benefit fromresearch that applies automated modelling tools and construction management principles to the planning,scheduling, and monitoring of the production process.
Program
Engage Grants Program
Location
Quebec, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
521994-2017
Name nom
Moselhi, Osama
Department département
Building, Civil and Environmental Engineering
Organization id
70
Institution établissement
Concordia University
Province en
Québec
Province fr
Québec
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2017
Competition year année de concours
2017
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1552
Committee name en
Quebec Internal Decision Committee
Committee name fr
Comité de décision interne pour le Québec
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Partie
1
Nb partie
1
Application title
Capacity planning model for a cabinetry manufacturing company
Keyword
NSERC
Application summary
One of the main challenges that Essence Cabinets in particular and the offsite construction domain in generalare facing is a production capacity problem. This includes gaining knowledge of the number of product typesthat can be produced in a given time span and the number of resources available in a given production system.A better understanding of the production capacity available, as well as the capacity required for each producttype, will empower the industry partner to optimize resource allocation, leading to improved time efficiencydue to higher resource utilization, and to satisfy due dates for each job. This research will be carried out in sixstages in order to analyze and streamline the production line, identify production bottlenecks, and determine aproduction capacity model: (1) study historical data to establish cabinetry system of systems; (2) benchmark theexisting production process; (3) develop a comprehensive simulation model of the production line; (4)determine the available production capacity; (5) develop KPIs for measuring the man-hour requirements perproduct type; and (6) establish a strategy for future research and development. Opportunities for developing adrafting and design tool for kitchen cabinets will be explored, aiming to help the industry partner to maximizeits resources. The highly qualified personnel working on this project will gain both direct industry experienceand theoretical expertise in the areas of lean, data analysis, construction planning, simulation, and projectmanagement techniques in the course of this project. In terms of benefits to Canada, one of the most commonchallenges that construction manufacturers face is capacity planning, which includes gaining better insight intothe maximum number of product types that can be produced in a specific mix, in a given time span, andconsidering available resources. The Canadian modular manufacturing industry thus stands to benefit fromresearch that applies automated modelling tools and construction management principles to the planning,scheduling, and monitoring of the production process.
Concordia University - $25,000 Grant (2017-18) | Canada Spends