Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Collaborative Research and Development Grants

University of Waterloo

$10,625.00

Investigation of steel-precast composite girders with non-conventional shear connectors

FY 2012-13

Summary
The use of rapid bridge replacement methods is an area receiving increasing attention from road authorities. The basic idea is that the associated increase in the initial bridge replacement cost will be offset by the significantly shortened time during which the level of service of the transportation network link is reduced. In large urban centres in particular, the user costs associated with the delays and detours resulting from the replacement of a bridge can make up a significant percentage of its total life-cycle cost. In the implementation of rapid bridge replacement methods, the optimal solutions often employ steel-concrete composite construction. When this type of construction is used, it is often in conjunction with precast deck slabs to avoid the additional work and time associated with cast-in-place concrete decks. Although this approach has its advantages, the current methods for providing a shear connection between precast deck slabs and steel girders, such as the use of stud pockets, have several signficant drawbacks. Recent research by the applicants has looked at the development of an alternative to the stud pocket approach. Based on this work, the following promising alternatives were identified: Approach 1) using post-installed shear connectors with friction enhanced contact surfaces Approach 2) using stiffened bearing plates at the precast panel ends On this basis, the proposed project involves the execution of additional analysis and laboratory testing to enable the development of design recommendations for these two shear connection approaches. For Approach 1, the planned work includes performing small-scale ""push"" tests on various connector arrangements, using the test results to develop shear interface models, and using these models to facilitate FE analysis studies of full-scale bridge girders employing this approach. For Approach 2), existing FE models will be modified and used to develop design recommendations and generalize the results of the previous work for other discrete shear connector intervals, bridge dimensions, and applications.
Program
Collaborative Research and Development Grants
Location
Ontario, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
412393-2011
Name nom
Walbridge, Scott
Department département
Civil & Environmental Engineering
Organization id
33
Institution établissement
University of Waterloo
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2012
Competition year année de concours
2011
Award amount
10625
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
700
Area of application group en
Transportation systems and services
Area of application group fr
Services et systèmes de transport
Area of application en
Transportation systems and services
Area of application fr
Services et systèmes de transport
Research subject code
1100
Research subject group en
Structural engineering
Research subject group fr
Génie des structures
Research subject en
Structural engineering
Research subject fr
Génie des structures
Partie
2
Nb partie
2
Application title
Investigation of steel-precast composite girders with non-conventional shear connectors
Keyword
NSERC
Application summary
The use of rapid bridge replacement methods is an area receiving increasing attention from road authorities. The basic idea is that the associated increase in the initial bridge replacement cost will be offset by the significantly shortened time during which the level of service of the transportation network link is reduced. In large urban centres in particular, the user costs associated with the delays and detours resulting from the replacement of a bridge can make up a significant percentage of its total life-cycle cost. In the implementation of rapid bridge replacement methods, the optimal solutions often employ steel-concrete composite construction. When this type of construction is used, it is often in conjunction with precast deck slabs to avoid the additional work and time associated with cast-in-place concrete decks. Although this approach has its advantages, the current methods for providing a shear connection between precast deck slabs and steel girders, such as the use of stud pockets, have several signficant drawbacks. Recent research by the applicants has looked at the development of an alternative to the stud pocket approach. Based on this work, the following promising alternatives were identified: Approach 1) using post-installed shear connectors with friction enhanced contact surfaces Approach 2) using stiffened bearing plates at the precast panel ends On this basis, the proposed project involves the execution of additional analysis and laboratory testing to enable the development of design recommendations for these two shear connection approaches. For Approach 1, the planned work includes performing small-scale ""push"" tests on various connector arrangements, using the test results to develop shear interface models, and using these models to facilitate FE analysis studies of full-scale bridge girders employing this approach. For Approach 2), existing FE models will be modified and used to develop design recommendations and generalize the results of the previous work for other discrete shear connector intervals, bridge dimensions, and applications.