Grant: Engage Grants Program
Concordia University
$25,000.00
Development of planning and estimating scaffolding system using BIM paradigm
FY 2018-19
Summary
Industrial construction projects (e.g., oil refineries) rely on a modular construction process which is*environmentally-friendly, provides a short completion time, and uses cost-competitive technology. PCL*Industrial Management Inc., as a general contractor in heavy industrial projects, has taken up a modular*construction approach to produce piperack modules at an offsite prefabrication facility and deliver them to the*construction site for installation. In this respect, the management team has mainly focused on reducing the*cycle time of the prefabrication process and designing better logistics (i.e., crane lift studies and transportation*logistics) by planning efficient operations and processes, where as much as 20% of operations can be*eliminated through careful planning. However, previous research and company practice have not given*attention to the scaffolding system (30-40% of the total man-hours of direct work), even though it is essential*on both prefabrication and construction sites to provide temporary elevated platforms to facilitate the work of*labourers and the movement of materials. In this respect, the effective planning and estimating of scaffolding*throughout the life cycle of the construction project can improve significantly project productivity and safety,*and reduce project cost. We thus propose a method which involves the following procedures: (i) study of the*existing scaffolding process and the requirements for heavy industrial projects; (ii) development of a database*structure and cost metrics based on identifying the locations of scaffolds and associated specific trades,*man-hours and task times spent using scaffolds, and weights/volumes of the scaffolds used; and (iii) integration*of BIM with data visualization in order to understand and monitor the utilization of the scaffolding work on the*construction site corresponding to the project progress. The results of the proposed research will be used to*develop more accurate scaffolding planning and estimation for project productivity and safety improvement in*future industrial projects.
Program
Engage Grants Program
Recipient
Location
Quebec, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
523220-2018
Name nom
Han, SangHyeok
Department département
Building, Civil and Environmental Engineering
Organization id
70
Institution établissement
Concordia University
Province en
Québec
Province fr
Québec
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2018
Competition year année de concours
2018
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1552
Committee name en
Quebec Internal Decision Committee
Committee name fr
Comité de décision interne pour le Québec
Area of application code
600
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction, urban and rural planning
Area of application fr
Construction, urbanisme et aménagement rural
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Partie
1
Nb partie
1
Application title
Development of planning and estimating scaffolding system using BIM paradigm
Keyword
NSERC
Application summary
Industrial construction projects (e.g., oil refineries) rely on a modular construction process which is*environmentally-friendly, provides a short completion time, and uses cost-competitive technology. PCL*Industrial Management Inc., as a general contractor in heavy industrial projects, has taken up a modular*construction approach to produce piperack modules at an offsite prefabrication facility and deliver them to the*construction site for installation. In this respect, the management team has mainly focused on reducing the*cycle time of the prefabrication process and designing better logistics (i.e., crane lift studies and transportation*logistics) by planning efficient operations and processes, where as much as 20% of operations can be*eliminated through careful planning. However, previous research and company practice have not given*attention to the scaffolding system (30-40% of the total man-hours of direct work), even though it is essential*on both prefabrication and construction sites to provide temporary elevated platforms to facilitate the work of*labourers and the movement of materials. In this respect, the effective planning and estimating of scaffolding*throughout the life cycle of the construction project can improve significantly project productivity and safety,*and reduce project cost. We thus propose a method which involves the following procedures: (i) study of the*existing scaffolding process and the requirements for heavy industrial projects; (ii) development of a database*structure and cost metrics based on identifying the locations of scaffolds and associated specific trades,*man-hours and task times spent using scaffolds, and weights/volumes of the scaffolds used; and (iii) integration*of BIM with data visualization in order to understand and monitor the utilization of the scaffolding work on the*construction site corresponding to the project progress. The results of the proposed research will be used to*develop more accurate scaffolding planning and estimation for project productivity and safety improvement in*future industrial projects.