Grant: Discovery Grants Program - Individual
Ryerson University
$21,000.00
Structural Design Issues of Accelerated Bridge Construction in Skew and Right Alignments
FY 2013-14
Summary
The use of prefabricated elements and systems in accelerating construction of new bridges and replacement of deteriorated ones has recently been the subject of much attention and interest amongst bridge jurisdictions. Prefabricated elements and systems can be quickly assembled and could reduce design efforts, reduce the impact on the environment in the vicinity of the site, and minimize the delays and lane closure time and inconvenience to the traveling public, saving time and tax payers money. One of these systems involve full-depth, full width, precast concrete deck slab placed transversally over steel or concrete girders where grout pockets are provided to accommodate clusters of shear connectors welded to steel girders or embedded in concrete girders. Literature review revealed a number of important unresolved analysis, design and performance issues which require detailed evaluation. These issues include: (i) the dead and live load distribution coefficients for non-composite bridges in skew alignment at construction stage during precast deck placement; (ii) live load distribution coefficients for composite bridges in skew alignment at ultimate and fatigue limit states; (iii) the dynamic load allowance (impact factor) due to trucks moving over a skew bridge as compared to a right one; (iv) transverse precast panel-to-panel connection incorporating glass fibre polymer (GFRP) bars with headed ends within bridge span for strength and durability; and (vi) GFRP-reinforced precast transverse panel-to-panel connection at the negative moment region to increase flexural strength of the composite girder at ultimate and fatigue limit states. The aim of this research is to contribute to the efficient design of bridges built with full-depth, full-width, precast deck panels by developing experimentally-calibrated, computer-based, design guidelines capable of predicting accurately their response when subjected to different loading , with potentially significant cost savings to bridge owners and inclusion in CHBDC. Field data and full-scale experimental results will provide a meaningful feedback to bridge designers, leading to a new generation of minimal maintenance bridges, detailed for inherent durability.
Program
Discovery Grants Program - Individual
Recipient
Location
Ontario, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
217083-2013
Name nom
Sennah, Khaled
Department département
Civil Engineering
Organization id
43
Institution établissement
Ryerson University
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2013
Competition year année de concours
2013
Award amount
21000
Program id
RGPIN
Program name en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
Discovery grants programs
Group fr
Programmes de subventions à la découverte
Committee code
1509
Committee name en
Civil, Industrial and Systems Engineering
Committee name fr
Génie civil, industriel et des systèmes
Area of application code
1206
Area of application group en
Advancement of knowledge
Area of application group fr
Avancement des connaissances
Area of application en
Engineering
Area of application fr
Génie
Research subject code
1000
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Civil engineering
Research subject fr
Génie civil
Partie
1
Nb partie
1
Application title
Structural Design Issues of Accelerated Bridge Construction in Skew and Right Alignments
Keyword
NSERC
Application summary
The use of prefabricated elements and systems in accelerating construction of new bridges and replacement of deteriorated ones has recently been the subject of much attention and interest amongst bridge jurisdictions. Prefabricated elements and systems can be quickly assembled and could reduce design efforts, reduce the impact on the environment in the vicinity of the site, and minimize the delays and lane closure time and inconvenience to the traveling public, saving time and tax payers money. One of these systems involve full-depth, full width, precast concrete deck slab placed transversally over steel or concrete girders where grout pockets are provided to accommodate clusters of shear connectors welded to steel girders or embedded in concrete girders. Literature review revealed a number of important unresolved analysis, design and performance issues which require detailed evaluation. These issues include: (i) the dead and live load distribution coefficients for non-composite bridges in skew alignment at construction stage during precast deck placement; (ii) live load distribution coefficients for composite bridges in skew alignment at ultimate and fatigue limit states; (iii) the dynamic load allowance (impact factor) due to trucks moving over a skew bridge as compared to a right one; (iv) transverse precast panel-to-panel connection incorporating glass fibre polymer (GFRP) bars with headed ends within bridge span for strength and durability; and (vi) GFRP-reinforced precast transverse panel-to-panel connection at the negative moment region to increase flexural strength of the composite girder at ultimate and fatigue limit states. The aim of this research is to contribute to the efficient design of bridges built with full-depth, full-width, precast deck panels by developing experimentally-calibrated, computer-based, design guidelines capable of predicting accurately their response when subjected to different loading , with potentially significant cost savings to bridge owners and inclusion in CHBDC. Field data and full-scale experimental results will provide a meaningful feedback to bridge designers, leading to a new generation of minimal maintenance bridges, detailed for inherent durability.