Grant: Engage Grants Program
Ryerson University
$23,605.00
A feasibility study on the application of lithium battery storage systems for renewable energy in the mining sector
FY 2012-13
Summary
The mining industry faces fundamental challenges in terms of its sustainability. These challenges are amplified
by the fact that many mining operations occur in remote locations where energy needs are met through diesel
generated power. However, mining companies are increasingly looking to renewable energy systems,
particularly solar and wind power, to provide more sustainable and ultimately lower cost power. The major
limitation of both wind and solar is the intermittent nature of the supply, depending on the vagaries of wind and
sun. To overcome this problem a variety of energy storage technologies have been proposed. One of the most
promising of these is large-format lithium ion battery systems.
This research project aims to investigate the technical and economic feasibility of using large battery energy
storage systems integrated with a renewable energy system, such as wind or solar, in the mining industry. The
project is based on the assumption that the purpose of battery storage is twofold: (1) provide backup power for
times when there is no power from intermittent sources and (2) to be able to seamlessly integrate power from a
renewable energy source into the main grid. The target market application is the mining industry. To address
this issue, the research team will work in collaboration with Electrovaya, an industry leader in the development
of lithium batteries. The key deliverables from this project will be: (1) A technical and economic feasibility
study for the application of large-format lithium ion battery systems for providing backup energy storage for
renewable energy systems in the mining industry. (2) A preliminary life cycle assessment and cost analysis for
the case of a mine operation with wind/solar power and large lithium BESS vs. the incumbent diesel-powered
approach. (3) The development of a project plan to carry out a pilot study for wind/solar energy integrated to a
BESS at a select remote mining site.
Program
Engage Grants Program
Recipient
Location
Ontario, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
446094-2012
Name nom
Searcy, Cory
Department département
Mechanical and Industrial Engineering
Organization id
43
Institution établissement
Ryerson University
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2012
Competition year année de concours
2012
Award amount
23605
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1553
Committee name en
Ontario Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Ontario
Area of application code
305
Area of application group en
Energy resources
Area of application group fr
Ressources d'énergie
Area of application en
Energy storage and conversion
Area of application fr
Stockage et transformation de l'énergie
Research subject code
1600
Research subject group en
Industrial engineering
Research subject group fr
Génie industriel
Research subject en
Industrial engineering
Research subject fr
Génie industriel
Partie
1
Nb partie
1
Application title
A feasibility study on the application of lithium battery storage systems for renewable energy in the mining sector
Keyword
NSERC
Application summary
The mining industry faces fundamental challenges in terms of its sustainability. These challenges are amplified
by the fact that many mining operations occur in remote locations where energy needs are met through diesel
generated power. However, mining companies are increasingly looking to renewable energy systems,
particularly solar and wind power, to provide more sustainable and ultimately lower cost power. The major
limitation of both wind and solar is the intermittent nature of the supply, depending on the vagaries of wind and
sun. To overcome this problem a variety of energy storage technologies have been proposed. One of the most
promising of these is large-format lithium ion battery systems.
This research project aims to investigate the technical and economic feasibility of using large battery energy
storage systems integrated with a renewable energy system, such as wind or solar, in the mining industry. The
project is based on the assumption that the purpose of battery storage is twofold: (1) provide backup power for
times when there is no power from intermittent sources and (2) to be able to seamlessly integrate power from a
renewable energy source into the main grid. The target market application is the mining industry. To address
this issue, the research team will work in collaboration with Electrovaya, an industry leader in the development
of lithium batteries. The key deliverables from this project will be: (1) A technical and economic feasibility
study for the application of large-format lithium ion battery systems for providing backup energy storage for
renewable energy systems in the mining industry. (2) A preliminary life cycle assessment and cost analysis for
the case of a mine operation with wind/solar power and large lithium BESS vs. the incumbent diesel-powered
approach. (3) The development of a project plan to carry out a pilot study for wind/solar energy integrated to a
BESS at a select remote mining site.