Grant: Discovery Grants Program - Individual
Concordia University
$19,000.00
Development of a relationship between specifications and in situ testing for concrete durability
FY 2007-08
Summary
The long-term durability of concrete infrastructure is highly dependant on its mixture design and subsequent handling and placement. However, rarely is concrete tested in the field to determine its adherence to specifications especially when they contain requirements for durability. Most commonly specified performance-based durability tests are conducted under standard laboratory conditions. However, the major drawback to most of these methods is that they are performed on concrete specimens 14 to 56 days after casting. In addition, these specimens may be prepared on-site, but are frequently relocated to a laboratory after casting. These relatively small specimens are subjected to different placement and curing techniques as well as a different temperature history. The program will investigate various techniques for their potential applicability for field-testing of durability as well as to assess their sensitivity to factors encountered on site (poor curing, poor compaction). The novelty of this program is that concrete will be tested for durability in the field conditions rather than in a laboratory environment. Ideally, the testing should be performed well before 28 days as tight construction schedules typically necessitate pouring large volumes of concrete in a short time period. Previous work by the applicant indicated that the majority of the changes occur in the first 7 days after casting. By testing as early as possible, any potential defects can be found quickly and corrective action taken. Durable concrete infrastructure is important to the Canadian economy as repair and replacement costs are significant as well as the associated decreases in productivity. In addition, the program will test existing structures to determine adherence to specifications and the likelihood of potential premature failure. The program results are expected to change the manner in which concrete is tested. By testing field concrete rather than standard lab specimens, project owners and engineers will have a more realistic indication of the expected long-term performance of the concrete structure. In turn, by becoming involved with monitoring site performance, contractors will become invested in the process of constructing a durable end product.The program will investigate various techniques for their potential applicability for field-testing of durability as well as to assess their sensitivity to factors encountered on site (poor curing, poor compaction). The novelty of this program is that concrete will be tested for durability in the field conditions rather than in a laboratory setting. Ideally, the testing should be performed well before 28 days as tight construction schedules typically necessitate pouring large volumes of concrete in a short time period. Previous work by the applicant indicated that the majority of the changes occur in the first 7 days after casting. By testing as early as possible, any potential defects can be found quickly and corrective action taken. The program results are expected to change the manner in which concrete is tested. By testing field concrete rather than standard lab specimens, project owners and engineers will have a more realistic indication of the expected long-term performance of the concrete structure. In turn, by becoming involved with monitoring site performance, contractors will become invested in the process of constructing a durable end product.
Program
Discovery Grants Program - Individual
Recipient
Location
Quebec, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
312213-2007
Name nom
Nokken, Michelle
Department département
Building, Civil and Environmental Engineering
Organization id
70
Institution établissement
Concordia University
Province en
Québec
Province fr
Québec
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2007
Competition year année de concours
2007
Award amount
19000
Program id
RGPIN
Program name en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
Discovery grants programs
Group fr
Programmes de subventions à la découverte
Committee code
6
Committee name en
Civil Engineering
Committee name fr
Génie civil
Area of application code
600
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction, urban and rural planning
Area of application fr
Construction, urbanisme et aménagement rural
Research subject code
1000
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Civil engineering
Research subject fr
Génie civil
Partie
1
Nb partie
5
Application title
Development of a relationship between specifications and in situ testing for concrete durability
Keyword
NA
Application summary
The long-term durability of concrete infrastructure is highly dependant on its mixture design and subsequent handling and placement. However, rarely is concrete tested in the field to determine its adherence to specifications especially when they contain requirements for durability. Most commonly specified performance-based durability tests are conducted under standard laboratory conditions. However, the major drawback to most of these methods is that they are performed on concrete specimens 14 to 56 days after casting. In addition, these specimens may be prepared on-site, but are frequently relocated to a laboratory after casting. These relatively small specimens are subjected to different placement and curing techniques as well as a different temperature history. The program will investigate various techniques for their potential applicability for field-testing of durability as well as to assess their sensitivity to factors encountered on site (poor curing, poor compaction). The novelty of this program is that concrete will be tested for durability in the field conditions rather than in a laboratory environment. Ideally, the testing should be performed well before 28 days as tight construction schedules typically necessitate pouring large volumes of concrete in a short time period. Previous work by the applicant indicated that the majority of the changes occur in the first 7 days after casting. By testing as early as possible, any potential defects can be found quickly and corrective action taken. Durable concrete infrastructure is important to the Canadian economy as repair and replacement costs are significant as well as the associated decreases in productivity. In addition, the program will test existing structures to determine adherence to specifications and the likelihood of potential premature failure. The program results are expected to change the manner in which concrete is tested. By testing field concrete rather than standard lab specimens, project owners and engineers will have a more realistic indication of the expected long-term performance of the concrete structure. In turn, by becoming involved with monitoring site performance, contractors will become invested in the process of constructing a durable end product.The program will investigate various techniques for their potential applicability for field-testing of durability as well as to assess their sensitivity to factors encountered on site (poor curing, poor compaction). The novelty of this program is that concrete will be tested for durability in the field conditions rather than in a laboratory setting. Ideally, the testing should be performed well before 28 days as tight construction schedules typically necessitate pouring large volumes of concrete in a short time period. Previous work by the applicant indicated that the majority of the changes occur in the first 7 days after casting. By testing as early as possible, any potential defects can be found quickly and corrective action taken. The program results are expected to change the manner in which concrete is tested. By testing field concrete rather than standard lab specimens, project owners and engineers will have a more realistic indication of the expected long-term performance of the concrete structure. In turn, by becoming involved with monitoring site performance, contractors will become invested in the process of constructing a durable end product.