Grant: Engage Grants Program
Ryerson University
$25,000.00
Reliability and availability modeling and failure prediction of Kruna Electric Haul Trucks and improvement of current maintenance policies
FY 2015-16
Summary
Vale's operations in Sudbury are among the largest on the planet, employing approximately 4,000 people. An underground copper/nickel mine located in Sudbury operates aggressively with an annual output of 100 million pounds of copper and 50 million pounds of nickel, in addition to other precious metals. Typically, the ore is blasted underground and transported by means of electrically powered trucks to a hoisting station whereby the ore is lifted to the surface. Failure of these trucks to be in an available state when needed poses a serious bottleneck to the flow of operation and consequently, production. Currently, there are a total of 6 trucks which are used generally-5 of which must be in operation at any time; and 1 undergoing repair. Maintenance personnel are concerned with the effectiveness of the current PM policies and would like to know the effect of
current PM policy on the trucks failure patterns-hence availability. Furthermore, any improvements to the current PM policies which would effectively increase truck availability is much desired. The main objective of this project is to develop methodologies for 1) reliability analysis and reliability modeling of AC and DC haulage trucks, 2) reliability analysis and reliability modeling of major systems of AC and DC trucks, 3) downtime and availability analysis of AC and DC trucks, and 4) the prediction of future failures and downtime of the trucks.
Program
Engage Grants Program
Recipient
Location
Ontario, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
479595-2015
Name nom
Taghipour, Sharareh
Department département
Mechanical and Industrial Engineering
Organization id
43
Institution établissement
Ryerson University
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2015
Competition year année de concours
2015
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1553
Committee name en
Ontario Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Ontario
Area of application code
520
Area of application group en
Manufacturing processes and products
Area of application group fr
Procédés et produits industriels
Area of application en
Production and operations management
Area of application fr
Production et gestion des opérations
Research subject code
1601
Research subject group en
Industrial engineering
Research subject group fr
Génie industriel
Research subject en
Operations research and management science
Research subject fr
Recherche opérationnelle et science de la gestion
Partie
1
Nb partie
1
Application title
Reliability and availability modeling and failure prediction of Kruna Electric Haul Trucks and improvement of current maintenance policies
Keyword
NSERC
Application summary
Vale's operations in Sudbury are among the largest on the planet, employing approximately 4,000 people. An underground copper/nickel mine located in Sudbury operates aggressively with an annual output of 100 million pounds of copper and 50 million pounds of nickel, in addition to other precious metals. Typically, the ore is blasted underground and transported by means of electrically powered trucks to a hoisting station whereby the ore is lifted to the surface. Failure of these trucks to be in an available state when needed poses a serious bottleneck to the flow of operation and consequently, production. Currently, there are a total of 6 trucks which are used generally-5 of which must be in operation at any time; and 1 undergoing repair. Maintenance personnel are concerned with the effectiveness of the current PM policies and would like to know the effect of
current PM policy on the trucks failure patterns-hence availability. Furthermore, any improvements to the current PM policies which would effectively increase truck availability is much desired. The main objective of this project is to develop methodologies for 1) reliability analysis and reliability modeling of AC and DC haulage trucks, 2) reliability analysis and reliability modeling of major systems of AC and DC trucks, 3) downtime and availability analysis of AC and DC trucks, and 4) the prediction of future failures and downtime of the trucks.