Grant: Engage Grants Program
Concordia University
$25,000.00
Cost-Based Cross-section Optimization of U- and Box-shaped Precast Prestressed Concrete Railway Bridge Girders
FY 2016-17
Summary
Optimum design of reinforced and prestressed concrete elements and structures has been drawing significantattention lately due to the rising cost of materials and construction techniques. Several cost index functionshave been proposed for bridge decks relating girder spacing and bridge span to the overall bridge cost.AASHTO bulb-tee sections received significant attention in those optimization attempts. As load demands gethigher (especially on railway structures) and crossings get wider due to higher traffic, the required bridge spansare getting bigger, so the conventional bulb-tee sections become bigger in section and the shift for U-tub orbox-girders becomes inevitable.Schokbeton is a leader manufacturer of precast and prestressed concrete panels that are widely used inQuébec, Canada and US in buildings, bridges and variety of infrastructure applications. With the current callfor proposals for efficient design of various railway projects in the province of Quebec, the current challengethat faces Schokbeton Inc. is to have an effective tool for achieving the optimum cost-saving design amongstvarious design alternatives.Schokbeton Inc. is specifically seeking a sound project to investigate the effect of all the design variables ofU- and Box- precast prestressed sections for the optimum design of railway bridges. The objective is to achievethe least material cost for various railway bridge configurations.The methodology adopted in this research project is to develop 3D models that simulate the response of precastprestressed under railway loads and to investigate the effect of varying the cross-section parameters on thecapacity of the bridge. Hence, the aim is to develop a cost-based cross-section optimization tool for U- andBox-shaped precast prestressed concrete railway bridge girders.The findings of this research project will have a direct impact on the Schokbeton preparedness formanufacturing optimized railway girder bridge sections, which is one of its current strategic focuses.
Program
Engage Grants Program
Recipient
Location
Quebec, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
507234-2016
Name nom
Galal, Khaled
Department département
Building, Civil and Environmental Engineering
Organization id
70
Institution établissement
Concordia University
Province en
Québec
Province fr
Québec
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2016
Competition year année de concours
2016
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1552
Committee name en
Quebec Internal Decision Committee
Committee name fr
Comité de décision interne pour le Québec
Area of application code
1001
Area of application group en
Northern development
Area of application group fr
Développement du nord
Area of application en
Construction, transportation and communications
Area of application fr
Construction, transports et communications
Research subject code
1103
Research subject group en
Structural engineering
Research subject group fr
Génie des structures
Research subject en
Concrete structures
Research subject fr
Structures en béton
Partie
1
Nb partie
1
Application title
Cost-Based Cross-section Optimization of U- and Box-shaped Precast Prestressed Concrete Railway Bridge Girders
Keyword
NSERC
Application summary
Optimum design of reinforced and prestressed concrete elements and structures has been drawing significantattention lately due to the rising cost of materials and construction techniques. Several cost index functionshave been proposed for bridge decks relating girder spacing and bridge span to the overall bridge cost.AASHTO bulb-tee sections received significant attention in those optimization attempts. As load demands gethigher (especially on railway structures) and crossings get wider due to higher traffic, the required bridge spansare getting bigger, so the conventional bulb-tee sections become bigger in section and the shift for U-tub orbox-girders becomes inevitable.Schokbeton is a leader manufacturer of precast and prestressed concrete panels that are widely used inQuébec, Canada and US in buildings, bridges and variety of infrastructure applications. With the current callfor proposals for efficient design of various railway projects in the province of Quebec, the current challengethat faces Schokbeton Inc. is to have an effective tool for achieving the optimum cost-saving design amongstvarious design alternatives.Schokbeton Inc. is specifically seeking a sound project to investigate the effect of all the design variables ofU- and Box- precast prestressed sections for the optimum design of railway bridges. The objective is to achievethe least material cost for various railway bridge configurations.The methodology adopted in this research project is to develop 3D models that simulate the response of precastprestressed under railway loads and to investigate the effect of varying the cross-section parameters on thecapacity of the bridge. Hence, the aim is to develop a cost-based cross-section optimization tool for U- andBox-shaped precast prestressed concrete railway bridge girders.The findings of this research project will have a direct impact on the Schokbeton preparedness formanufacturing optimized railway girder bridge sections, which is one of its current strategic focuses.