Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Alliance Grants

University of British Columbia

$138,000.00

Performance-based design of bridge retrofitting with novel techniques considering life-cycle analysis

FY 2021-22

Summary
A large portion of the bridge inventory in Canada has either passed or is approaching its end of service life. Such bridges are at high risk of collapse especially in regions prone to extreme natural events, which are becoming more frequent in large part due to the influence of climate change. Abandoning the bridge (total or partial closure with restricted access) will significantly affect the operation of a region. Replacing deficient bridges with new structures would require substantial investment and also impose significant carbon emission. Hence, retrofitting would be the safer method of mitigating risks. The limited financial resources coupled with the continuous drastic increase of deficient bridges in Canada calls for bold actions which can only be achieved through systematic, well-designed, and implementable research. The proposed academic-industrial collaboration addresses the above challenges through two tracks. The first one focuses on developing a systematic procedure that uses performance-based principles to identify and prioritize bridges that need to be evaluated for seismic retrofitting. The second track focuses on introducing innovative cost-effective bridge retrofit and repair measures and the development of performance-based design guidelines by integrating lifecycle and lifecycle cost analysis. The first phase of this project will deal with the inventory of all publicly owned bridges. Based on the data in the database, detailed evaluations of the bridge conditions will be performed using performance-based assessment. In the next phase, the prospect of innovative bridge retrofitting/repairing measures will be evaluated by a combination of experimental programs and extensive numerical simulations. Integrated lifecycle cost and performance-based design guidelines will be developed to ensure that the proposed novel measures are implementable in practice. The research team will work closely with the design code committee to formulate the appropriate framework with which the proposed design recommendations and guidelines can be incorporated into the design codes.
Program
Alliance Grants
Location
British Columbia, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
570565-2021
Name nom
Alam, Shahria
Department département
Okanagan - Engineering, School of
Organization id
2
Institution établissement
University of British Columbia
Province en
British Columbia
Province fr
Colombie-Britannique
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2021
Competition year année de concours
2021
Award amount
138000
Program id
ALLRP
Program name en
Alliance Grants
Program name fr
Subventions Alliance
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
601
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Structural engineering
Area of application fr
Génie des charpentes
Research subject code
1103
Research subject group en
Structural engineering
Research subject group fr
Génie des structures
Research subject en
Concrete structures
Research subject fr
Structures en béton
Installment
inst:1
Partie
1
Nb partie
2
Application title
Performance-based design of bridge retrofitting with novel techniques considering life-cycle analysis
Keyword
NSERC
Application summary
A large portion of the bridge inventory in Canada has either passed or is approaching its end of service life. Such bridges are at high risk of collapse especially in regions prone to extreme natural events, which are becoming more frequent in large part due to the influence of climate change. Abandoning the bridge (total or partial closure with restricted access) will significantly affect the operation of a region. Replacing deficient bridges with new structures would require substantial investment and also impose significant carbon emission. Hence, retrofitting would be the safer method of mitigating risks. The limited financial resources coupled with the continuous drastic increase of deficient bridges in Canada calls for bold actions which can only be achieved through systematic, well-designed, and implementable research. The proposed academic-industrial collaboration addresses the above challenges through two tracks. The first one focuses on developing a systematic procedure that uses performance-based principles to identify and prioritize bridges that need to be evaluated for seismic retrofitting. The second track focuses on introducing innovative cost-effective bridge retrofit and repair measures and the development of performance-based design guidelines by integrating lifecycle and lifecycle cost analysis. The first phase of this project will deal with the inventory of all publicly owned bridges. Based on the data in the database, detailed evaluations of the bridge conditions will be performed using performance-based assessment. In the next phase, the prospect of innovative bridge retrofitting/repairing measures will be evaluated by a combination of experimental programs and extensive numerical simulations. Integrated lifecycle cost and performance-based design guidelines will be developed to ensure that the proposed novel measures are implementable in practice. The research team will work closely with the design code committee to formulate the appropriate framework with which the proposed design recommendations and guidelines can be incorporated into the design codes.