Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Discovery Grants Program - Individual

University of Alberta

$22,000.00

Repair strategies for fatigued highway bridges

FY 2010-11

Summary
Many highway bridges currently in service in Canada were built in the 1950s when bridges were designed to permit lower demands than those permitted by current design standards (CSA-S16-06). This bridge population represents over 40% of the highway bridges across Canada and a significant portion of these bridges are structurally or functionally deficient, which means that they are in need of costly rehabilitation or replacement. These bridges are nearing the end of their design life and have been exposed to millions of load cycles from increasing volume and weight of truck traffic while exposed to harsh environments. It is estimated that roughly 12% of the 600,000 bridges in the USA are deficient and similar proportions of the Canadian bridges are expected to be in similar conditions or worst condition due to our severe climatic conditions over most of Canada. As a result, Canadian highways have hundreds of bridges exhibiting fatigue due to overload or environmental conditions, or some combination of these factors. Due to the high cost of replacement of currently deficient bridges, rehabilitation is the only economically viable approach to deal with the large inventory of aged bridges. Fatigue cracking, which is a common problem with steel bridges, represents a challenge since methods of repair of fatigue cracks are limited and not well understood. Although current design procedures for fatigue of new bridges are well understood by designers, this is not the case for repaired steel bridges. The assessment of the remaining fatigue life of rehabilitated bridges will form the basis for this discovery grant application. The project will consist of large scale tests on repaired bridge girders, field implementation and monitoring of repaired bridges and implementation of a reliabilitybased method to predict the remaining life of repaired bridges.
Program
Discovery Grants Program - Individual
Location
Alberta, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
170424-2010
Name nom
Grondin, Gilbert
Department département
Civil and Environmental Engineering
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2010
Competition year année de concours
2010
Award amount
22000
Program id
RGPIN
Program name en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
Discovery grants programs
Group fr
Programmes de subventions à la découverte
Committee code
1509
Committee name en
Civil, Industrial and Systems Engineering
Committee name fr
Génie civil, industriel et des systèmes
Area of application code
601
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Structural engineering
Area of application fr
Génie des charpentes
Research subject code
1100
Research subject group en
Structural engineering
Research subject group fr
Génie des structures
Research subject en
Structural engineering
Research subject fr
Génie des structures
Partie
1
Nb partie
1
Application title
Repair strategies for fatigued highway bridges
Keyword
NSERC
Application summary
Many highway bridges currently in service in Canada were built in the 1950s when bridges were designed to permit lower demands than those permitted by current design standards (CSA-S16-06). This bridge population represents over 40% of the highway bridges across Canada and a significant portion of these bridges are structurally or functionally deficient, which means that they are in need of costly rehabilitation or replacement. These bridges are nearing the end of their design life and have been exposed to millions of load cycles from increasing volume and weight of truck traffic while exposed to harsh environments. It is estimated that roughly 12% of the 600,000 bridges in the USA are deficient and similar proportions of the Canadian bridges are expected to be in similar conditions or worst condition due to our severe climatic conditions over most of Canada. As a result, Canadian highways have hundreds of bridges exhibiting fatigue due to overload or environmental conditions, or some combination of these factors. Due to the high cost of replacement of currently deficient bridges, rehabilitation is the only economically viable approach to deal with the large inventory of aged bridges. Fatigue cracking, which is a common problem with steel bridges, represents a challenge since methods of repair of fatigue cracks are limited and not well understood. Although current design procedures for fatigue of new bridges are well understood by designers, this is not the case for repaired steel bridges. The assessment of the remaining fatigue life of rehabilitated bridges will form the basis for this discovery grant application. The project will consist of large scale tests on repaired bridge girders, field implementation and monitoring of repaired bridges and implementation of a reliabilitybased method to predict the remaining life of repaired bridges.