Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Engage Grants Program

University of Alberta

$25,000.00

Preliminary Study of Pipeline Fatigue Crack Growth Prediction Utilizing Inline Inspection Data

FY 2015-16

Summary
Pipelines are known as the safest and most economical way to transport large quantities of oil and gas products. Enbridge Pipelines Inc. operates the world's longest crude oil and liquids transportation system. Pipelines are subject to different types of defects, such as fatigue crack, corrosion, etc. If proper remediation actions are not taken, these defects can eventually result in pipeline failures including leaks or ruptures, which lead to very expensive downtime, and leakage and spillage of pipeline contents to the environment. Inline inspections (ILI) are performed periodically using smart pigging tools, to detect defects and evaluate pipeline health conditions. Fatigue cracking refers to crack growth due to fatigue caused by pressure cycling during pipeline operations. Fatigue cracking is a key hazard for liquid pipelines, which has not been well understood. In this project, we plan to perform a preliminary study of pipeline fatigue crack growth prediction utilizing inline inspection data, and develop pipe physical models and integrated fatigue crack growth model considering a single fatigue crack. The proposed tools are expected to achieve improved fatigue crack prediction accuracy, with the presence of large crack sizing error. The proposed pipeline fatigue crack growth prediction methods can contribute to preventing pipeline leaks and ruptures, reducing expensive downtime, and avoiding damage to the environment.
Program
Engage Grants Program
Location
Alberta, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
485866-2015
Name nom
Tian, Zhigang
Department département
Mechanical Engineering
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2015
Competition year année de concours
2015
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1555
Committee name en
Prairie Internal Decision Committee
Committee name fr
Comité de décision interne pour les Prairies
Area of application code
300
Area of application group en
Energy resources
Area of application group fr
Ressources d'énergie
Area of application en
Energy resources (including production, exploration, processing, distribution and use)
Area of application fr
Ressources d'énergie (production, exploration, traitement, distribution et utilisation de l'énergie)
Research subject code
2109
Research subject group en
Mechanical engineering
Research subject group fr
Génie mécanique
Research subject en
Mechanical systems and instrumentation
Research subject fr
Instrumentation et systèmes mécaniques
Partie
1
Nb partie
1
Application title
Preliminary Study of Pipeline Fatigue Crack Growth Prediction Utilizing Inline Inspection Data
Keyword
NSERC
Application summary
Pipelines are known as the safest and most economical way to transport large quantities of oil and gas products. Enbridge Pipelines Inc. operates the world's longest crude oil and liquids transportation system. Pipelines are subject to different types of defects, such as fatigue crack, corrosion, etc. If proper remediation actions are not taken, these defects can eventually result in pipeline failures including leaks or ruptures, which lead to very expensive downtime, and leakage and spillage of pipeline contents to the environment. Inline inspections (ILI) are performed periodically using smart pigging tools, to detect defects and evaluate pipeline health conditions. Fatigue cracking refers to crack growth due to fatigue caused by pressure cycling during pipeline operations. Fatigue cracking is a key hazard for liquid pipelines, which has not been well understood. In this project, we plan to perform a preliminary study of pipeline fatigue crack growth prediction utilizing inline inspection data, and develop pipe physical models and integrated fatigue crack growth model considering a single fatigue crack. The proposed tools are expected to achieve improved fatigue crack prediction accuracy, with the presence of large crack sizing error. The proposed pipeline fatigue crack growth prediction methods can contribute to preventing pipeline leaks and ruptures, reducing expensive downtime, and avoiding damage to the environment.