Grant: Discovery Grants Program - Individual
University of Windsor
$21,000.00
Integrated Machine Grouping, Tool Allocation, and Sequencing in Line Design
FY 2016-17
Summary
Integrated Machine Grouping, Tool Allocation, and Sequencing in Line DesignThis research program provides an important support function to manufacturing process planning. In recent years, many manufacturers have made a significant investment to record the best manufacturing practices. The resulting databases and knowledge-bases give a good opportunity to offer an automation capability which can be materialized through a rigorous understanding of the process planning problem. The manufacturers will get a competitive advantage through the development of mathematical models and algorithms for automation and validation with industrial data. The proposal considers a high volume production of a complex part, which is produced in a transfer line. Here, machines are flexible and capable of performing all planned operations at a controllable speed. The capability of a machine is different when allocated with a different set of tools in its tool magazine. Each part requires machining of several design features and each design feature requires machining of several manufacturing operations. Set-up or changeover time depends on the sequence which is partly restricted by technological precedence constraints. Several machines are grouped into a workstation, which is assigned with operations that require a minimal set-up or changeover time. The problem is to develop a plan for machine grouping, sequencing, cutting tool allocation, and selection of cutting condition.
Program
Discovery Grants Program - Individual
Recipient
Location
Ontario, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
261509-2013
Name nom
Baki, MohammedFazle
Department département
Business, Odette School of
Organization id
37
Institution établissement
University of Windsor
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2016
Competition year année de concours
2013
Award amount
21000
Program id
RGPIN
Program name en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
Discovery grants programs
Group fr
Programmes de subventions à la découverte
Committee code
1509
Committee name en
Civil, Industrial and Systems Engineering
Committee name fr
Génie civil, industriel et des systèmes
Area of application code
520
Area of application group en
Manufacturing processes and products
Area of application group fr
Procédés et produits industriels
Area of application en
Production and operations management
Area of application fr
Production et gestion des opérations
Research subject code
1604
Research subject group en
Industrial engineering
Research subject group fr
Génie industriel
Research subject en
Manufacturing
Research subject fr
Fabrication
Partie
4
Nb partie
5
Application title
Integrated Machine Grouping, Tool Allocation, and Sequencing in Line Design
Keyword
NSERC
Application summary
Integrated Machine Grouping, Tool Allocation, and Sequencing in Line DesignThis research program provides an important support function to manufacturing process planning. In recent years, many manufacturers have made a significant investment to record the best manufacturing practices. The resulting databases and knowledge-bases give a good opportunity to offer an automation capability which can be materialized through a rigorous understanding of the process planning problem. The manufacturers will get a competitive advantage through the development of mathematical models and algorithms for automation and validation with industrial data. The proposal considers a high volume production of a complex part, which is produced in a transfer line. Here, machines are flexible and capable of performing all planned operations at a controllable speed. The capability of a machine is different when allocated with a different set of tools in its tool magazine. Each part requires machining of several design features and each design feature requires machining of several manufacturing operations. Set-up or changeover time depends on the sequence which is partly restricted by technological precedence constraints. Several machines are grouped into a workstation, which is assigned with operations that require a minimal set-up or changeover time. The problem is to develop a plan for machine grouping, sequencing, cutting tool allocation, and selection of cutting condition.