Grant: Engage Grants Program
Memorial University of Newfoundland
$25,000.00
Investigation of Zero Sequence Harmonics in the Power System of Calgary International Airport
FY 2016-17
Summary
The power system at Calgary International Airport (YYC) incorporates the use of utility power paralleled withlocal generation. There are total four generators, which are connected through two 5 MVA ratedautotransformers to step-up the voltage from a 13.2 kV local generation bus to a 25 kV utility bus. The poweris further distributed to the load from the 25 kV utility bus to downstream through six 3 MVA ratedtwo-winding transformers. Because this is new equipment, no significant loads are connected to the secondaryof the six 3 MVA transformers, i.e., the system is running at a light loading condition.If the system is supplied by the utility only, the operation is normal. However, when the system with bothutility and local generation is energized through two parallel autotransformers, the zero-sequence harmonicissue occurs. Recent voltage and current monitoring data indicate that there are very rich 3rd and 9th orderharmonic content in the current traces. These zero-sequence harmonic currents circulate in the two parallelautotransformers during the system's start-up and energizing, which causes the zero-sequence ground relay(51G) to trip. The ground detection threshold is set at 5 A. The circulating current builds over several cyclesand reaches the threshold (5 A) in about 10 cycles after the circuit breaker closes, it continues to increase forseveral cycles before reducing below 5 A after about 1 second. Presently, the temporary solution is to set 51Grelays with 2 second delays in order to allow the circulating current to dissipate without tripping 25 kV circuitbreakers. However, this is only fixing the symptom.The proposed research project aims to investigate fundamental theory and root cause of the problem inorder to better understand the phenomenon, and find an effective mitigation technique. The findings andsolution through this research can significantly improve future design of the equipment and the system, andgreatly benefit the company's business in similar areas.
Program
Engage Grants Program
Recipient
Location
Newfoundland and Labrador, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
505324-2016
Name nom
Liang, Xiaodong
Department département
Engineering and Applied Science, Faculty of
Organization id
89
Institution établissement
Memorial University of Newfoundland
Province en
Newfoundland and Labrador
Province fr
Terre-Neuve-et-Labrador
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2016
Competition year année de concours
2016
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1551
Committee name en
Atlantic Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Atlantique
Area of application code
513
Area of application group en
Manufacturing processes and products
Area of application group fr
Procédés et produits industriels
Area of application en
Electrical and electronic machinery and equipment (including computer hardware)
Area of application fr
Machinerie et équipement électriques et électroniques (y compris matériel informatique)
Research subject code
2501
Research subject group en
Electrical and electronic engineering
Research subject group fr
Génie électrique et électronique
Research subject en
Power systems
Research subject fr
Réseaux électriques
Partie
1
Nb partie
1
Application title
Investigation of Zero Sequence Harmonics in the Power System of Calgary International Airport
Keyword
NSERC
Application summary
The power system at Calgary International Airport (YYC) incorporates the use of utility power paralleled withlocal generation. There are total four generators, which are connected through two 5 MVA ratedautotransformers to step-up the voltage from a 13.2 kV local generation bus to a 25 kV utility bus. The poweris further distributed to the load from the 25 kV utility bus to downstream through six 3 MVA ratedtwo-winding transformers. Because this is new equipment, no significant loads are connected to the secondaryof the six 3 MVA transformers, i.e., the system is running at a light loading condition.If the system is supplied by the utility only, the operation is normal. However, when the system with bothutility and local generation is energized through two parallel autotransformers, the zero-sequence harmonicissue occurs. Recent voltage and current monitoring data indicate that there are very rich 3rd and 9th orderharmonic content in the current traces. These zero-sequence harmonic currents circulate in the two parallelautotransformers during the system's start-up and energizing, which causes the zero-sequence ground relay(51G) to trip. The ground detection threshold is set at 5 A. The circulating current builds over several cyclesand reaches the threshold (5 A) in about 10 cycles after the circuit breaker closes, it continues to increase forseveral cycles before reducing below 5 A after about 1 second. Presently, the temporary solution is to set 51Grelays with 2 second delays in order to allow the circulating current to dissipate without tripping 25 kV circuitbreakers. However, this is only fixing the symptom.The proposed research project aims to investigate fundamental theory and root cause of the problem inorder to better understand the phenomenon, and find an effective mitigation technique. The findings andsolution through this research can significantly improve future design of the equipment and the system, andgreatly benefit the company's business in similar areas.