Summary
hydro-electric facility located 70 km southeast of Kitimat, British Columbia is an impressive
feat of engineering due to both its scale and the remoteness of its location. The focus of this
research are two 16 km long water conveyance tunnels, one operational and one partially
complete. The first tunnel, T1, was completed in the 1950s, while T2 was partially excavated in
the early 1990s. The mountainous topography in the area poses challenges for rock support
design as the stresses around the tunnels vary widely along the tunnel alignment. Large
variations in stress orientations and magnitudes were identified from 2D finite element stress
models and these results corresponded to failure mechanisms observed on site. The proposed
research has the following goals:
1) Further evaluate the expected stress conditions around the continuation of the T2 tunnel by
constructing a large 3D stress analysis model covering the full length of both tunnels.
2) Incorporate predicted stresses at along the tunnel and data regarding lithology, ground water
inflow, and discontinuities into a probabilistic prediction tool called a Bayesian Network.
3) Use the developed Bayesian Network tool to predict ground classes along the tunnel.
4) Use the ground classes to recommend appropriate primary and final rock support to maintain
tunnel stability and in turn provide guidance on expected tunnelling costs and scheduling.
Program
Engage Plus Grants Program
Recipient
Location
British Columbia, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
490640-2015
Name nom
Tannant, Dwayne
Department département
Okanagan - Engineering, School of
Organization id
2
Institution établissement
University of British Columbia
Province en
British Columbia
Province fr
Colombie-Britannique
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2015
Competition year année de concours
2015
Award amount
6000
Program id
EGP2
Program name en
Engage Plus Grants Program
Program name fr
Programme de subvention d'engagement partenarial Plus
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1554
Committee name en
Pacific Internal Decision Committee
Committee name fr
Comité de décision interne pour le Pacifique
Area of application code
304
Area of application group en
Energy resources
Area of application group fr
Ressources d'énergie
Area of application en
Electrical energy
Area of application fr
Énergie électrique
Research subject code
1002
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Geotechnical engineering (including engineering geology)
Research subject fr
Géotechnique (y compris génie géologique)
Partie
1
Nb partie
1
Application title
Stress modelling and rock support for hydro-electric water tunnels
Keyword
NSERC
Application summary
hydro-electric facility located 70 km southeast of Kitimat, British Columbia is an impressive
feat of engineering due to both its scale and the remoteness of its location. The focus of this
research are two 16 km long water conveyance tunnels, one operational and one partially
complete. The first tunnel, T1, was completed in the 1950s, while T2 was partially excavated in
the early 1990s. The mountainous topography in the area poses challenges for rock support
design as the stresses around the tunnels vary widely along the tunnel alignment. Large
variations in stress orientations and magnitudes were identified from 2D finite element stress
models and these results corresponded to failure mechanisms observed on site. The proposed
research has the following goals:
1) Further evaluate the expected stress conditions around the continuation of the T2 tunnel by
constructing a large 3D stress analysis model covering the full length of both tunnels.
2) Incorporate predicted stresses at along the tunnel and data regarding lithology, ground water
inflow, and discontinuities into a probabilistic prediction tool called a Bayesian Network.
3) Use the developed Bayesian Network tool to predict ground classes along the tunnel.
4) Use the ground classes to recommend appropriate primary and final rock support to maintain