Grant: Collaborative Research and Development Grants
University of Toronto
$51,826.00
Power grid event detection and mitigation using phasor measurement units
FY 2014-15
Summary
The introduction of phasor measurement units (PMUs) represents a significant shift in the ability of utility companies to monitor and control their assets over a wide area. This is due to two key factors. The first is an unconventionally high reporting rate---typically 30 or 60 frames per second in North America, depending on the standard used. This is orders of magnitude higher than legacy data collection, which relies on scanning individual devices every few seconds (or minutes). The second major benefit of PMUs lies in the utilization of globally-synchronized sampling of system voltages and currents, achieved via GPS-based timing.The goal of the proposed research project is to use these new devices to improve system reliability via 1) enhanced identification of significant system events (e.g., generator or line outages) and 2) wide-area control in reaction to identified events. In addition, the proposal calls for the local installation and testing of a commercial PMU to ensure that the data quality and latency is sufficient.There are several benefits anticipated as a result of this project. First, the ability to quickly identify system events as they occur will provide Hydro One system operators with improved situational awareness, a critical component in preventing power grid failures. Furthermore, development of automatic control schemes that respond to such events will reduce the time it takes for the system to recover and, ultimately, improve overall system reliability.
Program
Collaborative Research and Development Grants
Recipient
Location
Ontario, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
470750-2014
Name nom
Tate, Joseph
Department département
Electrical & Computer Engineering
Organization id
31
Institution établissement
University of Toronto
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2014
Competition year année de concours
2014
Award amount
51826
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
304
Area of application group en
Energy resources
Area of application group fr
Ressources d'énergie
Area of application en
Electrical energy
Area of application fr
Énergie électrique
Research subject code
2516
Research subject group en
Electrical and electronic engineering
Research subject group fr
Génie électrique et électronique
Research subject en
Energy conversion and distribution
Research subject fr
Conversion et distribution de l'énergie
Partie
1
Nb partie
2
Application title
Power grid event detection and mitigation using phasor measurement units
Keyword
NSERC
Application summary
The introduction of phasor measurement units (PMUs) represents a significant shift in the ability of utility companies to monitor and control their assets over a wide area. This is due to two key factors. The first is an unconventionally high reporting rate---typically 30 or 60 frames per second in North America, depending on the standard used. This is orders of magnitude higher than legacy data collection, which relies on scanning individual devices every few seconds (or minutes). The second major benefit of PMUs lies in the utilization of globally-synchronized sampling of system voltages and currents, achieved via GPS-based timing.The goal of the proposed research project is to use these new devices to improve system reliability via 1) enhanced identification of significant system events (e.g., generator or line outages) and 2) wide-area control in reaction to identified events. In addition, the proposal calls for the local installation and testing of a commercial PMU to ensure that the data quality and latency is sufficient.There are several benefits anticipated as a result of this project. First, the ability to quickly identify system events as they occur will provide Hydro One system operators with improved situational awareness, a critical component in preventing power grid failures. Furthermore, development of automatic control schemes that respond to such events will reduce the time it takes for the system to recover and, ultimately, improve overall system reliability.