Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Applied Research and Development Grants - Level 1

Nova Scotia Community College

$25,000.00

Bathymetric lidar to support pre-engineering analysis for marine liquefied natural gas transport infrastructure

FY 2015-16

Summary
Pieridae Energy is proposing construction of a marine liquefied natural gas (LNG) terminal on Nova Scotia's eastern shore at Goldboro, in Guysborough County. Construction of the facility involves a wharf and a jetty extending from the shoreline approximately 1 km out into 20 m water depth. Accurate information on the geology and depth of the ocean bottom are required to plan construction of the facility in the most suitable location in order to minimize environmental impact. The Nova Scotia Community College's Applied Geomatics Research Group (AGRG) has recently acquired a topographic-bathymetric lidar system that can be used to obtain measurements of the land elevation and water depth using a laser onboard an airplane. This method of remote sensing avoids potential challenges of boat-based sampling, which include navigational hazards, high costs, and longer length of time to survey. AGRG will use the data collected during the lidar survey in a Geographic Information System (GIS) to help refine the location of the wharf and jetty and calculate volumetric estimates of infill required to construct these critical components of the LNG terminal infrastructure.
Program
Applied Research and Development Grants - Level 1
Location
Nova Scotia, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
485356-2015
Name nom
StAmour, Wayne
Department département
Head Office
Organization id
16240
Institution établissement
Nova Scotia Community College
Province en
Nova Scotia
Province fr
Nouvelle-Écosse
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2015
Competition year année de concours
2015
Award amount
25000
Program id
CARD1
Program name en
Applied Research and Development Grants - Level 1
Program name fr
Subventions de recherche et développement appliquée - niveau 1
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1561
Committee name en
Applied Research and Development Grants
Committee name fr
Subventions de recherche et développement appliquée
Area of application code
300
Area of application group en
Energy resources
Area of application group fr
Ressources d'énergie
Area of application en
Energy resources (including production, exploration, processing, distribution and use)
Area of application fr
Ressources d'énergie (production, exploration, traitement, distribution et utilisation de l'énergie)
Research subject code
4102
Research subject group en
Geographical information
Research subject group fr
Information géographique
Research subject en
Remote sensing
Research subject fr
Télédétection
Partie
1
Nb partie
1
Application title
Bathymetric lidar to support pre-engineering analysis for marine liquefied natural gas transport infrastructure
Keyword
NSERC
Application summary
Pieridae Energy is proposing construction of a marine liquefied natural gas (LNG) terminal on Nova Scotia's eastern shore at Goldboro, in Guysborough County. Construction of the facility involves a wharf and a jetty extending from the shoreline approximately 1 km out into 20 m water depth. Accurate information on the geology and depth of the ocean bottom are required to plan construction of the facility in the most suitable location in order to minimize environmental impact. The Nova Scotia Community College's Applied Geomatics Research Group (AGRG) has recently acquired a topographic-bathymetric lidar system that can be used to obtain measurements of the land elevation and water depth using a laser onboard an airplane. This method of remote sensing avoids potential challenges of boat-based sampling, which include navigational hazards, high costs, and longer length of time to survey. AGRG will use the data collected during the lidar survey in a Geographic Information System (GIS) to help refine the location of the wharf and jetty and calculate volumetric estimates of infill required to construct these critical components of the LNG terminal infrastructure.