Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Discovery Grants Program - Individual

University of Manitoba

$17,000.00

Rescheduling optimization of manufacturing systems in a dynamic environment

FY 2010-11

Summary
Global competition and rapid changes in technology are putting manufacturers under pressure to create a new generation of production systems. These systems must encompass high level of manufacturing flexibilities such as capacity, product mix, and product flexibilities which will require developing appropriate modeling and solution techniques for scheduling and control. The performance of a production system significantly depends on the availability of efficient rescheduling capabilities in order to deal with dynamic changes in real-time. A variety of conditions necessitate revisions to an existing schedule. Some of the common disturbances that call for rescheduling are: machine breakdown, rush order arrival, shortage of materials, over or underestimation of process time, order cancellation, and due date changes. The objective of this research is to develop rescheduling algorithms to deal with these sources of disturbances of the manufacturing system operation. Metaheuristic, heuristic and hybrid approaches will be considered for reoptimization of system's performance upon disturbance occurrence. A through comparison between these approaches will be conducted with respect to the obtained system performance and the needed solution time. The deliverable of the proposed research will be a novel approach of production scheduling optimization of manufacturing system in a dynamic environment. An important feature of the proposed research program is that it will deal with the development and implementation of various modeling and optimization techniques to real manufacturing issues. Consequently, several graduate and undergraduate students will receive advanced training.
Program
Discovery Grants Program - Individual
Location
Manitoba, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
311588-2008
Name nom
ElMekkawy, Tarek
Department département
Mechanical and Manufacturing Engineering
Organization id
19
Institution établissement
University of Manitoba
Province en
Manitoba
Province fr
Manitoba
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2010
Competition year année de concours
2008
Award amount
17000
Program id
RGPIN
Program name en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
Discovery grants programs
Group fr
Programmes de subventions à la découverte
Committee code
20
Committee name en
Industrial Engineering
Committee name fr
Génie industriel
Area of application code
520
Area of application group en
Manufacturing processes and products
Area of application group fr
Procédés et produits industriels
Area of application en
Production and operations management
Area of application fr
Production et gestion des opérations
Research subject code
1600
Research subject group en
Industrial engineering
Research subject group fr
Génie industriel
Research subject en
Industrial engineering
Research subject fr
Génie industriel
Partie
3
Nb partie
5
Application title
Rescheduling optimization of manufacturing systems in a dynamic environment
Keyword
NSERC
Application summary
Global competition and rapid changes in technology are putting manufacturers under pressure to create a new generation of production systems. These systems must encompass high level of manufacturing flexibilities such as capacity, product mix, and product flexibilities which will require developing appropriate modeling and solution techniques for scheduling and control. The performance of a production system significantly depends on the availability of efficient rescheduling capabilities in order to deal with dynamic changes in real-time. A variety of conditions necessitate revisions to an existing schedule. Some of the common disturbances that call for rescheduling are: machine breakdown, rush order arrival, shortage of materials, over or underestimation of process time, order cancellation, and due date changes. The objective of this research is to develop rescheduling algorithms to deal with these sources of disturbances of the manufacturing system operation. Metaheuristic, heuristic and hybrid approaches will be considered for reoptimization of system's performance upon disturbance occurrence. A through comparison between these approaches will be conducted with respect to the obtained system performance and the needed solution time. The deliverable of the proposed research will be a novel approach of production scheduling optimization of manufacturing system in a dynamic environment. An important feature of the proposed research program is that it will deal with the development and implementation of various modeling and optimization techniques to real manufacturing issues. Consequently, several graduate and undergraduate students will receive advanced training.