Grant: Engage Grants Program
University of Windsor
$25,000.00
Optimal Design of a Reinforced Fixation and Enclosure System for transportation and handling of Skinned Curtain Walls
FY 2019-20
Summary
A universal enclosure and lifting fixture is proposed to handle large prefabricated curtain walls. Curtain walls are simply sheets of glass surrounded by a metallic frame that are installed on the facade of a building. The curtain walls come in an array of sizes and weights, all of them massive in size and dangerous to the worker handling them. Handling here means to load these single or double skinned panels onto and unload them off trailers, encapsulate them during transportation, from facility to construction site (for protection), raise them using on-site cranes, rotate them from the horizontal to the vertical orientation mid-air, and finally support their installation onto buildings. The challenge put forth is to develop a fixture that can handle, not one, but two panels at the same time because manufacturers in this industry are constantly required to install more panels in less time. Dr. Ahmed Azab at the University of Windsor will work with Contract Glaziers Inc. to develop this fixture and enclosure system. A successfully implemented project would allow the company (Contract Glaziers Inc.) to glaze buildings quicker all the while cutting costs and providing a safer environment for the workers. This technique is unprecedented and will raise the capability of this Canadian company 10 fold; providing faster services for local construction and becoming more competitive abroad. This is a simple product with an array of integrated solutions that improve every step of this company's operations; beginning with the finished good, all the way to on-site installation and pushes the prefabrication industry forward.
Program
Engage Grants Program
Recipient
Location
Ontario, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
538081-2019
Name nom
AzabIsmail, Ahmed
Department département
Mechanical, Automotive and Materials Engineering
Organization id
37
Institution établissement
University of Windsor
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2019
Competition year année de concours
2019
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
RESEARCH PARTNERSHIPS
Group fr
PARTENARIATS DE RECHERCHE
Committee code
1553
Committee name en
Ontario Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Ontario
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Installment
inst:1 - 1
Partie
1
Nb partie
1
Application title
Optimal Design of a Reinforced Fixation and Enclosure System for transportation and handling of Skinned Curtain Walls
Keyword
NSERC
Application summary
A universal enclosure and lifting fixture is proposed to handle large prefabricated curtain walls. Curtain walls are simply sheets of glass surrounded by a metallic frame that are installed on the facade of a building. The curtain walls come in an array of sizes and weights, all of them massive in size and dangerous to the worker handling them. Handling here means to load these single or double skinned panels onto and unload them off trailers, encapsulate them during transportation, from facility to construction site (for protection), raise them using on-site cranes, rotate them from the horizontal to the vertical orientation mid-air, and finally support their installation onto buildings. The challenge put forth is to develop a fixture that can handle, not one, but two panels at the same time because manufacturers in this industry are constantly required to install more panels in less time. Dr. Ahmed Azab at the University of Windsor will work with Contract Glaziers Inc. to develop this fixture and enclosure system. A successfully implemented project would allow the company (Contract Glaziers Inc.) to glaze buildings quicker all the while cutting costs and providing a safer environment for the workers. This technique is unprecedented and will raise the capability of this Canadian company 10 fold; providing faster services for local construction and becoming more competitive abroad. This is a simple product with an array of integrated solutions that improve every step of this company's operations; beginning with the finished good, all the way to on-site installation and pushes the prefabrication industry forward.