Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Discovery Grants Program - Individual

University of Calgary

$33,000.00

Design & optimizatiion of public transport & airport systems

FY 2010-11

Summary
Sustainable provision of mobility for the population requires efficient systems such as public transport systems which have significant economies of scale. The main objective of the research is to design and optimize public transit and airport systems that provide a balance between the level of service (L of S) provided & the costs of the system. This involves the minimization of the total cost consisting of time (and delay) related ""costs"" to passengers & the system capital and operating costs. Three sub-projects are (a) Optimal aircraft de-icing procedures at airports taking into account passenger and airline delay costs and system operating costs, (b) Reliability of bus routes with explicit consideration of travel time and delay costs as well as operating costs, and (c) Design of Light Rail Transit (LRT) networks. All three projects are related to the theme of ""efficient public transport systems"" and will be subject to similar optimization techniques. This research will be mainly based on transportation engineering, analytical modeling and optimization. DE-ICING AT AIRPORTS: Severe delays occur at Canadian airports when aircraft require de-icing. These delays are additional to direct weather related delays. On-ramp OR off-ramp de-icing systems may be implemented. We investigate the two systems and their relationship to the airport capacity and configuration, & the optimal order in which aircraft are de-iced, based on the scheduled departure time, the destination, the passenger load of the flight, and the time required to de-ice various aircraft. In the case of on-ramp de-icing, we will take into account the physical locations of aircraft on the ramp, and also investigate the optimal fleet size of de-icing trucks. BUS RELIABILITY: We will research strategies to keep buses running on time to an optimal (minimum total cost) schedule including the number and location of 'time-points' on a route. LIGHT RAIL TRANSIT (LRT) NETWORK DESIGN: The design of an LRT network will be investigated. The optimal design of a single line is well understood but little work has been done on LRT network design. The routing of lines which are in part surface, elevated and underground will form part of the research. The main trade-off in the design is the access and in-line travel times of passengers vs. the costs of building & operating the system.
Program
Discovery Grants Program - Individual
Location
Alberta, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
4711-2010
Name nom
Wirasinghe, SumedhaChandana
Department département
Civil Engineering
Organization id
11
Institution établissement
University of Calgary
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2010
Competition year année de concours
2010
Award amount
33000
Program id
RGPIN
Program name en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
Discovery grants programs
Group fr
Programmes de subventions à la découverte
Committee code
1509
Committee name en
Civil, Industrial and Systems Engineering
Committee name fr
Génie civil, industriel et des systèmes
Area of application code
700
Area of application group en
Transportation systems and services
Area of application group fr
Services et systèmes de transport
Area of application en
Transportation systems and services
Area of application fr
Services et systèmes de transport
Research subject code
1003
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Transportation engineering
Research subject fr
Génie du transport
Partie
1
Nb partie
5
Application title
Design & optimizatiion of public transport & airport systems
Keyword
NSERC
Application summary
Sustainable provision of mobility for the population requires efficient systems such as public transport systems which have significant economies of scale. The main objective of the research is to design and optimize public transit and airport systems that provide a balance between the level of service (L of S) provided & the costs of the system. This involves the minimization of the total cost consisting of time (and delay) related ""costs"" to passengers & the system capital and operating costs. Three sub-projects are (a) Optimal aircraft de-icing procedures at airports taking into account passenger and airline delay costs and system operating costs, (b) Reliability of bus routes with explicit consideration of travel time and delay costs as well as operating costs, and (c) Design of Light Rail Transit (LRT) networks. All three projects are related to the theme of ""efficient public transport systems"" and will be subject to similar optimization techniques. This research will be mainly based on transportation engineering, analytical modeling and optimization. DE-ICING AT AIRPORTS: Severe delays occur at Canadian airports when aircraft require de-icing. These delays are additional to direct weather related delays. On-ramp OR off-ramp de-icing systems may be implemented. We investigate the two systems and their relationship to the airport capacity and configuration, & the optimal order in which aircraft are de-iced, based on the scheduled departure time, the destination, the passenger load of the flight, and the time required to de-ice various aircraft. In the case of on-ramp de-icing, we will take into account the physical locations of aircraft on the ramp, and also investigate the optimal fleet size of de-icing trucks. BUS RELIABILITY: We will research strategies to keep buses running on time to an optimal (minimum total cost) schedule including the number and location of 'time-points' on a route. LIGHT RAIL TRANSIT (LRT) NETWORK DESIGN: The design of an LRT network will be investigated. The optimal design of a single line is well understood but little work has been done on LRT network design. The routing of lines which are in part surface, elevated and underground will form part of the research. The main trade-off in the design is the access and in-line travel times of passengers vs. the costs of building & operating the system.