Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Collaborative Research and Development Grants

University of Manitoba

$90,000.00

Durability of ultra-high performance concrete as joint-fill material for precast bridge desk panels

FY 2017-18

Summary
The majority of bridges in North America are becoming obsolete and structurally deficient as they are nearing the end of their service life. Many aging bridges in Canada will need major rehabilitation in this century. Current estimates place the national bridge infrastructure funding deficit in Canada at more than $20 billion per year. Additional indirect costs such as those incurred due to closures of major transportation routes during construction will have severe consequences on the nation's economy and will have to be addressed. To reduce the costs associated with rehabilitation or replacement of bridge infrastructure, there has been a strong desire to minimize construction time and the impact on the surrounding environment and transportation network involved. This has led to a push for the development of Accelerated Bridge Construction (ABC) practices, which use modular precast bridge components that are installed on-site, rather than conventional cast-in-place (CIP) concrete bridge decks. Whether the project is the construction of a new structure, or the rehabilitation of an existing deteriorated structure, implementing precast bridge deck panel systems can greatly accelerate the project schedule. The proposed research project aims to address one aspect of ABC by developing long-term performance data of ultra high performance concrete (UHPC) jointed precast prestressed concrete panel (PPCP) bridge systems subjected to fatigue loads and temperature variations. A scaled model of the panel segments with UHPC joints and shear pockets will be tested and the behaviour of the joints in negative bending will be investigated. This project will determine suitable size and shape of sheer pockets when using UHPC. Data from a bridge-way in motion installation on Morris Bridge in Manitoba will be analyzed and a finite element model of the structure will be verified and used to predict algorithms to determine the fatigue life of bridges. Developing such an approach will be a significant contribution to current bridge design and maintenance practices.
Program
Collaborative Research and Development Grants
Location
Manitoba, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
499956-2016
Name nom
Svecova, Dagmar
Department département
Civil Engineering
Organization id
19
Institution établissement
University of Manitoba
Province en
Manitoba
Province fr
Manitoba
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2017
Competition year année de concours
2016
Award amount
90000
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1000
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Civil engineering
Research subject fr
Génie civil
Partie
1
Nb partie
1
Application title
Durability of ultra-high performance concrete as joint-fill material for precast bridge desk panels
Keyword
NSERC
Application summary
The majority of bridges in North America are becoming obsolete and structurally deficient as they are nearing the end of their service life. Many aging bridges in Canada will need major rehabilitation in this century. Current estimates place the national bridge infrastructure funding deficit in Canada at more than $20 billion per year. Additional indirect costs such as those incurred due to closures of major transportation routes during construction will have severe consequences on the nation's economy and will have to be addressed. To reduce the costs associated with rehabilitation or replacement of bridge infrastructure, there has been a strong desire to minimize construction time and the impact on the surrounding environment and transportation network involved. This has led to a push for the development of Accelerated Bridge Construction (ABC) practices, which use modular precast bridge components that are installed on-site, rather than conventional cast-in-place (CIP) concrete bridge decks. Whether the project is the construction of a new structure, or the rehabilitation of an existing deteriorated structure, implementing precast bridge deck panel systems can greatly accelerate the project schedule. The proposed research project aims to address one aspect of ABC by developing long-term performance data of ultra high performance concrete (UHPC) jointed precast prestressed concrete panel (PPCP) bridge systems subjected to fatigue loads and temperature variations. A scaled model of the panel segments with UHPC joints and shear pockets will be tested and the behaviour of the joints in negative bending will be investigated. This project will determine suitable size and shape of sheer pockets when using UHPC. Data from a bridge-way in motion installation on Morris Bridge in Manitoba will be analyzed and a finite element model of the structure will be verified and used to predict algorithms to determine the fatigue life of bridges. Developing such an approach will be a significant contribution to current bridge design and maintenance practices.
University of Manitoba - $90,000 Grant (2017-18) | Canada Spends