Grant: Engage Grants Program
Memorial University of Newfoundland
$25,000.00
Study on selective calcium removal by adsorption and gypsum precipitation control
FY 2018-19
Summary
At Vale Long Harbour Processing Plant, nickel concentrate is leached using pressure oxidation process to*recover nickel, copper and cobalt, and lime is used to raise the pH of leach liquor to remove iron as precipitate.*Due to the high concentrations of calcium ion from the use of lime in iron removal process and sulfate ion in*the leach liquor, gypsum (CaSO4.2H2O) precipitate builds up very quickly in pipeline systems, resulting in*severe flow restrictions. To overcome the problem temporarily, the plant is in the process of building bypass*lines to allow cleaning the clogged main pipelines. It takes time, labour and money to clean pipelines with*gypsum scale. This is a serious process and technological problem they must solve for smooth and stable*production, especially in winter time when cold temperatures promote increased gypsum scaling rates.*The precipitation of gypsum is determined by the product of calcium ion concentration and sulfate ion*concentration in the processed system. In this project, we plan to solve or reduce the magnitude of the gypsum*fouling problem through selective calcium removal by adsorption using resins or other absorbents, or/and*controlled gypsum precipitation, i.e., accelerating gypsum precipitation in large volume tanks or thickeners,*which is much easier for gypsum cleaning and processing, before the solution with high concentrations of*calcium ion and sulfate ion enters to the pipeline systems. Engineering, environmental and economic factors*will be considered for process determination.*The accomplishment of this NSERC Engage program will help Vale Long Harbour Processing Plant maintain a*more stable and controllable nickel production process. The program is of great technological, economic and*social significances to Vale Long Harbour Operations and the Province of Newfoundland and Labrador.
Program
Engage Grants Program
Recipient
Location
Newfoundland and Labrador, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data
As published
Application id
531339-2018
Name nom
Zhang, Yahui
Department département
Process Engineering
Organization id
89
Institution établissement
Memorial University of Newfoundland
Province en
Newfoundland and Labrador
Province fr
Terre-Neuve-et-Labrador
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2018
Competition year année de concours
2018
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1551
Committee name en
Atlantic Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Atlantique
Area of application code
202
Area of application group en
Natural resources (economic aspects)
Area of application group fr
Ressources naturelles (aspects économiques)
Area of application en
Mineral resources ( prospecting, exploration, mining, extraction, processing)
Area of application fr
Ressources minérales (prospection, exploration, mines, extraction et préparation)
Research subject code
2003
Research subject group en
Materials science and technology
Research subject group fr
Science et technologie des matériaux
Research subject en
Metallurgy
Research subject fr
Métallurgie
Partie
1
Nb partie
1
Application title
Study on selective calcium removal by adsorption and gypsum precipitation control
Keyword
NSERC
Application summary
At Vale Long Harbour Processing Plant, nickel concentrate is leached using pressure oxidation process to*recover nickel, copper and cobalt, and lime is used to raise the pH of leach liquor to remove iron as precipitate.*Due to the high concentrations of calcium ion from the use of lime in iron removal process and sulfate ion in*the leach liquor, gypsum (CaSO4.2H2O) precipitate builds up very quickly in pipeline systems, resulting in*severe flow restrictions. To overcome the problem temporarily, the plant is in the process of building bypass*lines to allow cleaning the clogged main pipelines. It takes time, labour and money to clean pipelines with*gypsum scale. This is a serious process and technological problem they must solve for smooth and stable*production, especially in winter time when cold temperatures promote increased gypsum scaling rates.*The precipitation of gypsum is determined by the product of calcium ion concentration and sulfate ion*concentration in the processed system. In this project, we plan to solve or reduce the magnitude of the gypsum*fouling problem through selective calcium removal by adsorption using resins or other absorbents, or/and*controlled gypsum precipitation, i.e., accelerating gypsum precipitation in large volume tanks or thickeners,*which is much easier for gypsum cleaning and processing, before the solution with high concentrations of*calcium ion and sulfate ion enters to the pipeline systems. Engineering, environmental and economic factors*will be considered for process determination.*The accomplishment of this NSERC Engage program will help Vale Long Harbour Processing Plant maintain a*more stable and controllable nickel production process. The program is of great technological, economic and*social significances to Vale Long Harbour Operations and the Province of Newfoundland and Labrador.