Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Engage Grants Program

University of Toronto

$25,000.00

Optimal transportation and inventory planning for arctic mining

FY 2013-14

Summary
The Nechalacho Rare Earth Element Deposit is about 5 km north of the Hearne Channel of Great Slave Lakeand approximately 100 km southeast of the city of Yellowknife. Avalon plans to build a mine and a 2,000tonne/day concentrator at the Thor Lake site with a 20 year mine life that begins production at the end of 2016.Due to its remote location, the site is accessible by air year-round, by barge through the summer months and byice road for approximately one month every year around February-March. The site will require supplies,reagents, and fuel year-round. Concentrates produced on site will have to be shipped off site for furtherprocessing. This leads to a complex planning problem, in which in-bound and out-bound transportation shouldbe planned with a consideration of the limited access to the site. The objective is to minimize operating costs atthe flotation plant on site by improving methods of material delivery to site as well as concentrates off the site.The cost is the sum of the transportation cost and the inventory cost on site over a year and the main decision isto determine the level of transportation activities over time. A complication arises as the summer months, inwhich barge can access the site, are shifting back and forth due to the uncertainty in weather conditions.The transportation is mainly to supply reagent and fuel to the flotation plant on site and to ship concentrates offsite for further processing. As the concentrates are currently stored and transported in container, which is quiteexpensive, it is also an important decision to determine the number of containers kept in the system. The scopeof the problem is geographically limited to the area involving Pine Point and the flotation plant located at ThorLake
Program
Engage Grants Program
Location
Ontario, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
451446-2013
Name nom
Lee, ChiGuhn
Department département
Mechanical and Industrial Engineering
Organization id
31
Institution établissement
University of Toronto
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2013
Competition year année de concours
2013
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1553
Committee name en
Ontario Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Ontario
Area of application code
520
Area of application group en
Manufacturing processes and products
Area of application group fr
Procédés et produits industriels
Area of application en
Production and operations management
Area of application fr
Production et gestion des opérations
Research subject code
1603
Research subject group en
Industrial engineering
Research subject group fr
Génie industriel
Research subject en
Logistics
Research subject fr
Logistique
Partie
1
Nb partie
1
Application title
Optimal transportation and inventory planning for arctic mining
Keyword
NSERC
Application summary
The Nechalacho Rare Earth Element Deposit is about 5 km north of the Hearne Channel of Great Slave Lakeand approximately 100 km southeast of the city of Yellowknife. Avalon plans to build a mine and a 2,000tonne/day concentrator at the Thor Lake site with a 20 year mine life that begins production at the end of 2016.Due to its remote location, the site is accessible by air year-round, by barge through the summer months and byice road for approximately one month every year around February-March. The site will require supplies,reagents, and fuel year-round. Concentrates produced on site will have to be shipped off site for furtherprocessing. This leads to a complex planning problem, in which in-bound and out-bound transportation shouldbe planned with a consideration of the limited access to the site. The objective is to minimize operating costs atthe flotation plant on site by improving methods of material delivery to site as well as concentrates off the site.The cost is the sum of the transportation cost and the inventory cost on site over a year and the main decision isto determine the level of transportation activities over time. A complication arises as the summer months, inwhich barge can access the site, are shifting back and forth due to the uncertainty in weather conditions.The transportation is mainly to supply reagent and fuel to the flotation plant on site and to ship concentrates offsite for further processing. As the concentrates are currently stored and transported in container, which is quiteexpensive, it is also an important decision to determine the number of containers kept in the system. The scopeof the problem is geographically limited to the area involving Pine Point and the flotation plant located at ThorLake