Canada Spends Logo

Explore our Budget 2026 analysis

Grant: Collaborative Research and Development Grants

University of Alberta

$140,000.00

Improving oil sands process operations through advanced estimations for process control systems

FY 2010-11

Summary
Following the development of the diagnostic system, a solutions strategy for process improvement needs to be established. Natural questions, such as what to do after a process unit or instrument has been diagnosed to be or potentially to be problematic, have to be answered. A typical process control system consists of processes, sensors, actuators and controllers. The post-diagnosis solutions mean that one needs to find timely solutions for each problematic component, for example, to calibrate problematic sensors, develop inferential models for key variables, quantify the extent of actuator problems, re-identify the problematic process models for controller re-tuning, or determine process problems such as sands built-up in a pipe line or percentage of bitumen wasted in separation tailings. These problems can all be considered under a post-diagnosis estimation framework. Built upon our previous success in collaborative research and development projects, we are ready to carry forward the work from control system performance monitoring & diagnosis to process control improvement solutions. Under this new initiative, we will establish a novel post-diagnosis solutions strategy through dynamic estimations for process control systems. Specifically, we will endeavour to (1) maximize the use of the existing resources by assessing process data quality for parameter estimation, (2) develop an optimal design strategy for dynamic experiments, and (3) use advanced estimation techniques to determine key parameters of interest, under closed-loop operations, in the presence of irregularly sampled data and process constraints. Over the last several years, the oil industries have operated their facilities with increasing efficiency and effectiveness by leveraging Process Control and Automation Systems in their operation. This trend is expected to continue in the future with expected higher service factors and utilization. Now is the prime opportune time over the next few years to further leverage Process Control Infrastructures through advanced estimation methodologies, to be ready for the next major economic development.
Program
Collaborative Research and Development Grants
Location
Alberta, Canada
Recipient Type
Academia
Type
Grant
Source
NSERC's Awards Data

As published

Application id
385287-2009
Name nom
Huang, Biao
Department département
Chemical and Materials Engineering
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2010
Competition year année de concours
2009
Award amount
140000
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
301
Area of application group en
Energy resources
Area of application group fr
Ressources d'énergie
Area of application en
Oil, gas and coal
Area of application fr
Pétrole, gaz et charbon
Research subject code
1702
Research subject group en
Design and manufacturing
Research subject group fr
Conception et fabrication
Research subject en
Advanced manufacturing
Research subject fr
Méthodes de fabrication avancées
Partie
2
Nb partie
5
Application title
Improving oil sands process operations through advanced estimations for process control systems
Keyword
NSERC
Application summary
Following the development of the diagnostic system, a solutions strategy for process improvement needs to be established. Natural questions, such as what to do after a process unit or instrument has been diagnosed to be or potentially to be problematic, have to be answered. A typical process control system consists of processes, sensors, actuators and controllers. The post-diagnosis solutions mean that one needs to find timely solutions for each problematic component, for example, to calibrate problematic sensors, develop inferential models for key variables, quantify the extent of actuator problems, re-identify the problematic process models for controller re-tuning, or determine process problems such as sands built-up in a pipe line or percentage of bitumen wasted in separation tailings. These problems can all be considered under a post-diagnosis estimation framework. Built upon our previous success in collaborative research and development projects, we are ready to carry forward the work from control system performance monitoring & diagnosis to process control improvement solutions. Under this new initiative, we will establish a novel post-diagnosis solutions strategy through dynamic estimations for process control systems. Specifically, we will endeavour to (1) maximize the use of the existing resources by assessing process data quality for parameter estimation, (2) develop an optimal design strategy for dynamic experiments, and (3) use advanced estimation techniques to determine key parameters of interest, under closed-loop operations, in the presence of irregularly sampled data and process constraints. Over the last several years, the oil industries have operated their facilities with increasing efficiency and effectiveness by leveraging Process Control and Automation Systems in their operation. This trend is expected to continue in the future with expected higher service factors and utilization. Now is the prime opportune time over the next few years to further leverage Process Control Infrastructures through advanced estimation methodologies, to be ready for the next major economic development.