Contribution: Disaster Mitigation and Adaptation Fund
City of Notre-Dame-de-l'Île-Perrot | Ville de Notre-Dame-de-l'Île-Perrot
$2,189,952.00
Stabilization of the Vieux-Moulin Road and Perrot Boulevard banks against erosion, in Notre-Dame-de-l'Île-Perrot
FY 2025-26 · 2025-08-26
Summary
Erosion is threatening the integrity of Boulevard Perrot (Notre-Dame de l'Île-Perrot's main road) and Chemin du Vieux-Moulin in some areas. In some places, only one metre of shoreline remains. The project consists of stabilizing the banks in the most critical areas in order to protect the integrity of these two roads, including the drinking water pipes, the sanitary sewer pipes and the overhead electrical network. In addition, the project will ensure the safety of the citizens living in these areas. Considering that Perrot Boulevard and Vieux-Moulin Road are the only arteries giving access to the residences in their respective sectors, the closure of these sections, temporarily or permanently, would no longer allow citizens to access and leave their homes safely.
Program
Disaster Mitigation and Adaptation FundDisaster Mitigation and Adaptation Fund (linked with high confidence)
Location
Notre-Dame-De-L'Île-Perrot | Notre-Dame-De-L'Île-Perrot, Quebec, Canada
Recipient Type
Government
Type
Contribution
Source
Proactive Disclosure - Grants and Contributions
As published
Agreement End Date
2033-03-31
Agreement Start Date
2025-08-26
Agreement Title
Stabilization of the Vieux-Moulin Road and Perrot Boulevard banks against erosion, in Notre-Dame-de-l'Île-Perrot
Agreement Title (French)
Stabilisation des berges du chemin du Vieux-Moulin et du boulevard Perrot contre l'érosion, à Notre-Dame-de-l'Île-Perrot
Agreement Type
Contribution
Agreement Value
$2,189,952.00
Amendment Number
0
Description
Erosion is threatening the integrity of Boulevard Perrot (Notre-Dame de l'Île-Perrot's main road) and Chemin du Vieux-Moulin in some areas. In some places, only one metre of shoreline remains. The project consists of stabilizing the banks in the most critical areas in order to protect the integrity of these two roads, including the drinking water pipes, the sanitary sewer pipes and the overhead electrical network. In addition, the project will ensure the safety of the citizens living in these areas. Considering that Perrot Boulevard and Vieux-Moulin Road are the only arteries giving access to the residences in their respective sectors, the closure of these sections, temporarily or permanently, would no longer allow citizens to access and leave their homes safely.
Description (French)
L'érosion menace par endroits l'intégrité du Boulevard Perrot (route principale de Notre-Dame de l'Île-Perrot) et du chemin du Vieux-Moulin. Il ne reste, par endroit, qu'un seul mètre de rive. Le projet consiste à stabiliser les berges aux endroits les plus critiques de façon à protéger l'intégrité de ces deux routes incluant les conduites d'eau potable, les conduites d'égout sanitaires et le réseau électrique aérien. De plus, le projet permet d'assurer la sécurité des citoyens qui habitent ces secteurs. Considérant que le boulevard Perrot et le chemin du Vieux-Moulin sont les seuls artères donnant accès aux résidences de leur secteur respectif, la fermeture de ces tronçons, de façon temporaire ou de façon permanente, ne nous permettrait plus de permettre aux citoyens d'avoir accès et de quitter sécuritairement leur domicile.
Organization Code
infc
Organization
Department of Housing, Infrastructure and Communities | Ministère du Logement, de l’Infrastructure et des Collectivités
Program Name
Disaster Mitigation and Adaptation Fund
Program Name (French)
Fonds d'atténuation et d'adaptation en matière de catastrophe
Recipient City
Notre-Dame-De-L'Île-Perrot | Notre-Dame-De-L'Île-Perrot
Recipient Country
CA
Recipient Legal Name
City of Notre-Dame-de-l'Île-Perrot | Ville de Notre-Dame-de-l'Île-Perrot
Recipient Province or Territory
QC
Recipient Type
G
Reference Number
278-2025-2026-Q2-00027