Grant: Collaborative Research and Development Grants
McGill University
$112,606.00
Geotechnical risk assessment of haulage drifts during the life of a mine plan
EF 2009-10
Résumé
In a globally competitive minerals market, Canadian mines continue to face the pressure to reduce costs. One approach to reducing mining costs is by the reduction of unplanned interruptions to production for the rehabilitation of haulage drifts. These drifts are the principal roadways for haulage trucks and load-haul-dump vehicles, which transport the blasted ore from the mining block or stope to the nearest ore transfer facility such as an ore pass. Unplanned interruptions to production can have adverse influence on the cost of mining and ultimately on the profitability of an operation. Drift rehabilitation involves the installation of additional ground supports to help the drift regain its stability and functionality. Thus, it would be advantageous to be able to know ahead of time when and where a haulage drift is due for maintenance or support enhancement during its service life so that a preventive maintenance program can be scheduled and implemented in a timely fashion without interruption to production. Currently, there are no established guidelines to help the mine planner assess drift stability condition as it changes (deteriorates) with mining activities. The goal of this research project is thus to develop new design tools capable of predicting the location, timing and magnitude of required drift support enhancement with respect to scheduled mining activities during the service life of the drift. With these new tools, interruption to production schedule can be eliminated or minimized thus reducing cost. The new design tools will be developed from the study of the geotechnical risk of drift instability and how it is affected by the extraction of nearby mining blocks. Drift geotechnical stability is determined from numerical (computer) modelling analyses which account for the rock mass properties as well as the geometric configuration of the mining system and block extraction sequence. Model results are then compared with measurements and /or observations from the field to validate the models. The project case study is the Garson Mine of Vale Inco Limited. While the study is focused on the Garson Mine, its findings will be applicable to many other underground metal mines in Canada and other mining countries.
Programme
Collaborative Research and Development Grants
Bénéficiaire
Emplacement
Quebec, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
369133-2008
Name nom
Mitri, Hani
Department département
Mining & Materials Engineering.
Organization id
61
Institution établissement
McGill University
Province en
Québec
Province fr
Québec
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2009
Competition year année de concours
2008
Award amount
112606
Program id
CRDPJ
Program nane en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
202
Area of application group en
Natural resources (economic aspects)
Area of application group fr
Ressources naturelles (aspects économiques)
Area of application en
Mineral resources ( prospecting, exploration, mining, extraction, processing)
Area of application fr
Ressources minérales (prospection, exploration, mines, extraction et préparation)
Research subject code
1401
Research subject group en
Mining and mineral processing
Research subject group fr
Génie minier et minéral
Research subject en
Mining engineering
Research subject fr
Génie minier
Partie
2
Nb partie
3
Application title
Geotechnical risk assessment of haulage drifts during the life of a mine plan
Keyword
NA
Application summary
In a globally competitive minerals market, Canadian mines continue to face the pressure to reduce costs. One approach to reducing mining costs is by the reduction of unplanned interruptions to production for the rehabilitation of haulage drifts. These drifts are the principal roadways for haulage trucks and load-haul-dump vehicles, which transport the blasted ore from the mining block or stope to the nearest ore transfer facility such as an ore pass. Unplanned interruptions to production can have adverse influence on the cost of mining and ultimately on the profitability of an operation. Drift rehabilitation involves the installation of additional ground supports to help the drift regain its stability and functionality. Thus, it would be advantageous to be able to know ahead of time when and where a haulage drift is due for maintenance or support enhancement during its service life so that a preventive maintenance program can be scheduled and implemented in a timely fashion without interruption to production. Currently, there are no established guidelines to help the mine planner assess drift stability condition as it changes (deteriorates) with mining activities. The goal of this research project is thus to develop new design tools capable of predicting the location, timing and magnitude of required drift support enhancement with respect to scheduled mining activities during the service life of the drift. With these new tools, interruption to production schedule can be eliminated or minimized thus reducing cost. The new design tools will be developed from the study of the geotechnical risk of drift instability and how it is affected by the extraction of nearby mining blocks. Drift geotechnical stability is determined from numerical (computer) modelling analyses which account for the rock mass properties as well as the geometric configuration of the mining system and block extraction sequence. Model results are then compared with measurements and /or observations from the field to validate the models. The project case study is the Garson Mine of Vale Inco Limited. While the study is focused on the Garson Mine, its findings will be applicable to many other underground metal mines in Canada and other mining countries.