Grant: Discovery Grants Program - Individual
Ryerson University
$24,000.00
Probabilistic Life-Cycle Costing: Beyond the Great Expectation
EF 2019-20
Résumé
The backbone of our nation's economy, Canada's civil infrastructure has been long suffering. The reasons are systemic and multi-faceted, ranging from funding deficits and uncoordinated systems planning, to unrelenting extreme events and inefficient engineering design and management. Meanwhile, public expectations on infrastructure have moved from safety, health and mobility to the notions such as intelligence, resilience, sustainability and flexibility. Transparency in infrastructure-related decision makings is also an important factor in winning public support. To meet these challenges, a risk-informed life-cycle infrastructure engineering (RILCIE) theory that provides a holistic solution to modern infrastructure issues must be established. The applicant's long-term research goal is to advance RILCIE by developing theories, methods and tools that can be applied to support practical decision makings. Aligning with this long-term goal, the proposed research program aims to answer a burning question that arises in almost every stage of the infrastructure life cycle: How much does it cost and how much contingency is required to build a piece of infrastructure and uphold its services to a satisfactory level? Searching for a complete answer to this question goes much deeper than simple cost accounting. It turns out to be a scientific endeavor that involves several fundamental, intertwined research issues, including stochastic degradation modeling, time-dependent reliability analysis, lifetime prediction, optimal inspection and maintenance planning, time preference and discounting, and risk-informed decision making. The proposed research program focuses on the development of an advanced probabilistic life-cycle costing system that would address these issues with an emphasis on the modeling of uncertainties involved in each key component of the analysis. The use of the life-cycle cost information goes beyond conventional applications such as alternative comparisons. Rather, it is proposed to play a pivotal role in evaluating innovative project delivery models such as public-private partnerships, developing integrated optimal design and asset management plans, and guiding risk-informed structural integrity management each representing a very different aspect of infrastructure issues at distinguishing phases of infrastructure life. The proposed uncertainty modeling methodology for a full probabilistic quantification - rather than the average or expectation only - of the life-cycle cost, and the way of using the cost information for decision making support are highly original and innovative. The proposed research is expected to have a significant impact on project evaluation, engineering design, and infrastructure asset management. The research program includes a comprehensive highly-qualified personnel training plan of six PhD and three MASc students.
Programme
Discovery Grants Program - Individual
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
RGPIN-2016-06280
Name nom
Yuan, Xianxun(Arnold)
Department département
Civil Engineering
Organization id
43
Institution établissement
Ryerson University
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2019
Competition year année de concours
2016
Award amount
24000
Program id
RGPIN
Program name en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
DISCOVERY RESEARCH
Group fr
RECHERCHE AXÉE SUR LA DÉCOUVERTE
Committee code
1509
Committee name en
Civil, Industrial and Systems Engineering
Committee name fr
Génie civil, industriel et des systèmes
Area of application code
600
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction, urban and rural planning
Area of application fr
Construction, urbanisme et aménagement rural
Research subject code
1101
Research subject group en
Structural engineering
Research subject group fr
Génie des structures
Research subject en
Structural loads and safety
Research subject fr
Charges structurales et sécurité
Installment
inst:4 - 5
Partie
4
Nb partie
5
Application title
Probabilistic Life-Cycle Costing: Beyond the Great Expectation
Keyword
NSERC
Application summary
The backbone of our nation's economy, Canada's civil infrastructure has been long suffering. The reasons are systemic and multi-faceted, ranging from funding deficits and uncoordinated systems planning, to unrelenting extreme events and inefficient engineering design and management. Meanwhile, public expectations on infrastructure have moved from safety, health and mobility to the notions such as intelligence, resilience, sustainability and flexibility. Transparency in infrastructure-related decision makings is also an important factor in winning public support. To meet these challenges, a risk-informed life-cycle infrastructure engineering (RILCIE) theory that provides a holistic solution to modern infrastructure issues must be established. The applicant's long-term research goal is to advance RILCIE by developing theories, methods and tools that can be applied to support practical decision makings. Aligning with this long-term goal, the proposed research program aims to answer a burning question that arises in almost every stage of the infrastructure life cycle: How much does it cost and how much contingency is required to build a piece of infrastructure and uphold its services to a satisfactory level? Searching for a complete answer to this question goes much deeper than simple cost accounting. It turns out to be a scientific endeavor that involves several fundamental, intertwined research issues, including stochastic degradation modeling, time-dependent reliability analysis, lifetime prediction, optimal inspection and maintenance planning, time preference and discounting, and risk-informed decision making. The proposed research program focuses on the development of an advanced probabilistic life-cycle costing system that would address these issues with an emphasis on the modeling of uncertainties involved in each key component of the analysis. The use of the life-cycle cost information goes beyond conventional applications such as alternative comparisons. Rather, it is proposed to play a pivotal role in evaluating innovative project delivery models such as public-private partnerships, developing integrated optimal design and asset management plans, and guiding risk-informed structural integrity management each representing a very different aspect of infrastructure issues at distinguishing phases of infrastructure life. The proposed uncertainty modeling methodology for a full probabilistic quantification - rather than the average or expectation only - of the life-cycle cost, and the way of using the cost information for decision making support are highly original and innovative. The proposed research is expected to have a significant impact on project evaluation, engineering design, and infrastructure asset management. The research program includes a comprehensive highly-qualified personnel training plan of six PhD and three MASc students.