Grant: Engage Grants Program

University of Toronto

$25,000.00

Scheduling system for wind tower manufacturing

EF 2014-15

Résumé
Wind tower production is mainly divided into 2 parts: Black and white tower process. The black tower production consists of blasting, cutting, beveling, bending, horizontal welding, flanging, vertical welding, and door frame assembly. On the other hand, white tower production involves blasting, painting, drying, and internal mounting. It is mainly the black tower production that is sensitive to operational conditions and hence causes variability in daily throughput. Therefore, the proposed study will focus on the scheduling of the black tower production.The main challenge to the scheduling is that the vertical welding requires inventory of all skirt types. A tower consists of typically three sections, each of which again consists of 10 to 15 skirts. These skirts are different in the shape and the thickness of steel plate used. Therefore, different skirts have varying production rates as well as require different types of equipment in the manufacturing process. This poses a challenge to the scheduling of the black tower manufacturing.We propose to formulate the scheduling problem as a mathematical programming problem. In particular, it will be an integer linear programming. The formulation of the scheduling system will be non-trivial given the sheer number of skirt types and manufacturing constraints.
Programme
Engage Grants Program
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
473219-2014
Name nom
Lee, ChiGuhn
Department département
Mechanical and Industrial Engineering
Organization id
31
Institution établissement
University of Toronto
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2014
Competition year année de concours
2014
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1553
Committee name en
Ontario Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Ontario
Area of application code
500
Area of application group en
Manufacturing processes and products
Area of application group fr
Procédés et produits industriels
Area of application en
Manufacturing processes and products
Area of application fr
Procédés et produits industriels
Research subject code
1604
Research subject group en
Industrial engineering
Research subject group fr
Génie industriel
Research subject en
Manufacturing
Research subject fr
Fabrication
Partie
1
Nb partie
1
Application title
Scheduling system for wind tower manufacturing
Keyword
NSERC
Application summary
Wind tower production is mainly divided into 2 parts: Black and white tower process. The black tower production consists of blasting, cutting, beveling, bending, horizontal welding, flanging, vertical welding, and door frame assembly. On the other hand, white tower production involves blasting, painting, drying, and internal mounting. It is mainly the black tower production that is sensitive to operational conditions and hence causes variability in daily throughput. Therefore, the proposed study will focus on the scheduling of the black tower production.The main challenge to the scheduling is that the vertical welding requires inventory of all skirt types. A tower consists of typically three sections, each of which again consists of 10 to 15 skirts. These skirts are different in the shape and the thickness of steel plate used. Therefore, different skirts have varying production rates as well as require different types of equipment in the manufacturing process. This poses a challenge to the scheduling of the black tower manufacturing.We propose to formulate the scheduling problem as a mathematical programming problem. In particular, it will be an integer linear programming. The formulation of the scheduling system will be non-trivial given the sheer number of skirt types and manufacturing constraints.