Grant: Engage Grants Program
University of Western Ontario
$25,000.00
Assessment of transmission line structures under dwonbursts and tornadoes
EF 2011-12
Résumé
High Intensity Winds (HIW), in the form of tornadoes and downbursts, are responsible for more than 80% of
all the world's weather-related transmission line failures. Despite this fact, the codes of practice do not provide
clear guidelines for designing transmission towers to resist such events. A research program was recently
conducted at the University of Western Ontario (UWO) in collaboration with Manitoba Hydro (MH) and a
contribution of the NSERC CRD Program. This research program led to the development of a numerical tool
capable of predicting the response of transmission lines to both tornadoes and downbursts. One of the
challenges in HIW structural problems results from the localized nature of those events. The forces acting on
the structure depends on the location of the storm relative to the structure. As such, the tornado and downburst
locations leading to maximum effects on the structure have to be identified. It was reported by a number of
researchers that of all the populated areas in Canada, South Western Ontario experiences the highest rate of
tornado incidences. The current study will involve collaboration between researchers at the University of
Western Ontario and engineers from the utility company Hydro One. The main objective of the study is to
investigate the behaviour of two major transmission line systems in Ontario and to assess their ability to resist
various downburst and tornado intensities. In the proposed study, the two selected transmission line systems
will be simulated numerically. The previously developed computer code will be used to determine the critical
downburst and tornado configurations leading to maximum internal forces in various members of the towers,
which will be then compared with the strength capacities of the members. The study will assist Hydro One in
making decisions about the need to strengthen existing towers and about the design procedure of new
structures.
Programme
Engage Grants Program
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
412745-2011
Name nom
ElDamatty, Ashraf
Department département
Civil and Environmental Engineering
Organization id
36
Institution établissement
University of Western Ontario
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2011
Competition year année de concours
2011
Award amount
25000
Program id
EGP
Program nane en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1553
Committee name en
Ontario Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Ontario
Area of application code
601
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Structural engineering
Area of application fr
Génie des charpentes
Research subject code
1100
Research subject group en
Structural engineering
Research subject group fr
Génie des structures
Research subject en
Structural engineering
Research subject fr
Génie des structures
Partie
1
Nb partie
1
Application title
Assessment of transmission line structures under dwonbursts and tornadoes
Keyword
NSERC
Application summary
High Intensity Winds (HIW), in the form of tornadoes and downbursts, are responsible for more than 80% of
all the world's weather-related transmission line failures. Despite this fact, the codes of practice do not provide
clear guidelines for designing transmission towers to resist such events. A research program was recently
conducted at the University of Western Ontario (UWO) in collaboration with Manitoba Hydro (MH) and a
contribution of the NSERC CRD Program. This research program led to the development of a numerical tool
capable of predicting the response of transmission lines to both tornadoes and downbursts. One of the
challenges in HIW structural problems results from the localized nature of those events. The forces acting on
the structure depends on the location of the storm relative to the structure. As such, the tornado and downburst
locations leading to maximum effects on the structure have to be identified. It was reported by a number of
researchers that of all the populated areas in Canada, South Western Ontario experiences the highest rate of
tornado incidences. The current study will involve collaboration between researchers at the University of
Western Ontario and engineers from the utility company Hydro One. The main objective of the study is to
investigate the behaviour of two major transmission line systems in Ontario and to assess their ability to resist
various downburst and tornado intensities. In the proposed study, the two selected transmission line systems
will be simulated numerically. The previously developed computer code will be used to determine the critical
downburst and tornado configurations leading to maximum internal forces in various members of the towers,
which will be then compared with the strength capacities of the members. The study will assist Hydro One in
making decisions about the need to strengthen existing towers and about the design procedure of new
structures.