Canada Spends Logo

Explorez notre analyse du budget 2026

Grant: Discovery Grants Program - Individual

University of Ottawa

$19,000.00

Hydraulics of stream barbs

EF 2012-13

Résumé
Stream 'barbs' are a new form of stream-bank erosion control structure that is designed for installation along the (erosion-prone) outside banks of stream bends. Barbs differ from the more traditional revetment-type bank protection measures, (e.g., rock rip-rap and gabion structures), in that: (i) they use considerably less material than is required in the traditional approaches, and (ii) they actively counteract the flow mechanisms that cause erosion and also promote deposition of sediments in the vicinity of the eroding bank. Accordingly, barbs are an economically attractive alternative approach to solving the bank erosion problem. They also represent a superior long-term solution to this problem. The applicant's continuing research work on this subject will proceed in two phases. Phase one will be a combined mathematical modeling/laboratory study that will: (i) examine the hydraulic performance of various arrangements of model barbs installed in channel bends of different curvature when operating under mobile bed conditions, (ii) investigate the impacts of barbs on the large-scale turbulence structure of the bend flow fields, and (iii) on the basis of (i) and (ii), develop appropriate design criteria to help promote a wider application of the barb structure for stream bank protection. Phase two will be a complimentary field study that will monitor the hydraulic performance of a barb system to be installed in an unstable bend of Ottawa's Sawmill Creek in the Fall of 2008/Winter of 2009. Sawmill Creek is an urban stream formed in glaciomarine (Champlain Sea) clay deposits. This will be the first time in North America that barbs are used to stabilize an eroding bank of a channel formed in clay. Accordingly, this field test will present a unique opportunity to evaluate the efficacy of applying this new form of bank-protection structure to streams formed in clay deposits.
Programme
Discovery Grants Program - Individual
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
7443-2008
Name nom
Townsend, RonaldDavid
Department département
Civil Engineering
Organization id
28
Institution établissement
University of Ottawa
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2012
Competition year année de concours
2008
Award amount
19000
Program id
RGPIN
Program name en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
Discovery grants programs
Group fr
Programmes de subventions à la découverte
Committee code
1062
Committee name en
Civil Engineering - B
Committee name fr
Génie civil - B
Area of application code
403
Area of application group en
Environment
Area of application group fr
Environnement
Area of application en
Inland waters
Area of application fr
Eaux intérieures
Research subject code
1005
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Hydraulic engineering
Research subject fr
Génie hydraulique
Partie
5
Nb partie
5
Application title
Hydraulics of stream barbs
Keyword
NSERC
Application summary
Stream 'barbs' are a new form of stream-bank erosion control structure that is designed for installation along the (erosion-prone) outside banks of stream bends. Barbs differ from the more traditional revetment-type bank protection measures, (e.g., rock rip-rap and gabion structures), in that: (i) they use considerably less material than is required in the traditional approaches, and (ii) they actively counteract the flow mechanisms that cause erosion and also promote deposition of sediments in the vicinity of the eroding bank. Accordingly, barbs are an economically attractive alternative approach to solving the bank erosion problem. They also represent a superior long-term solution to this problem. The applicant's continuing research work on this subject will proceed in two phases. Phase one will be a combined mathematical modeling/laboratory study that will: (i) examine the hydraulic performance of various arrangements of model barbs installed in channel bends of different curvature when operating under mobile bed conditions, (ii) investigate the impacts of barbs on the large-scale turbulence structure of the bend flow fields, and (iii) on the basis of (i) and (ii), develop appropriate design criteria to help promote a wider application of the barb structure for stream bank protection. Phase two will be a complimentary field study that will monitor the hydraulic performance of a barb system to be installed in an unstable bend of Ottawa's Sawmill Creek in the Fall of 2008/Winter of 2009. Sawmill Creek is an urban stream formed in glaciomarine (Champlain Sea) clay deposits. This will be the first time in North America that barbs are used to stabilize an eroding bank of a channel formed in clay. Accordingly, this field test will present a unique opportunity to evaluate the efficacy of applying this new form of bank-protection structure to streams formed in clay deposits.