Grant: Collaborative Research and Development Grants
Carleton University
$14,000.00
Evaluation of Time-Dependent Pile Capacity Increase in Sensitive Soils
EF 2011-12
Résumé
Determination of ultimate pile capacity is important for proper design and construction of pile foundations. The pile capacity obtained from a load test, carried out shortly after the installation of pile, is often assumed to be the ultimate pile capacity in most design methods. However, the pile capacity could increase after installation as the excess pore pressure at the soil-pile interface dissipates. This time dependent increase in bearing capacity of piles, referred to as pile set-up, is not incorporated in current pile design. Therefore, current pile installation practice seems to be conservative as the contribution of capacity gain over time is neglected in the design.
The purpose of this collaborative research is to conduct experimental research aimed at developing a prediction system to estimate the pile capacity increase in soft and sensitive clays and to develop a relationship between the pile capacity and elapsed time after initial installation. The proposed research will involve a series of laboratory tests that will examine effects of soil type, loading rate, pile materials and installation method on pile capacity gain.
Prediction of pile capacity gain with time after driving would certainly be advantageous from economical standpoint. Incorporating the effects of set-up into pile design is expected to reduce the general cost of piling projects by reducing pile diameter, pile length, size of driving equipment, and subsequently piling duration. The knowledge and information can also be used during construction to choose a relevant time for a pile loading test.
Programme
Collaborative Research and Development Grants
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
419103-2011
Name nom
TofighRayhani, Mohammad
Department département
Civil and Environmental Engineering
Organization id
23
Institution établissement
Carleton University
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2011
Competition year année de concours
2011
Award amount
14000
Program id
CRDPJ
Program nane en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
1206
Area of application group en
Advancement of knowledge
Area of application group fr
Avancement des connaissances
Area of application en
Engineering
Area of application fr
Génie
Research subject code
1002
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Geotechnical engineering (including engineering geology)
Research subject fr
Géotechnique (y compris génie géologique)
Partie
1
Nb partie
2
Application title
Evaluation of Time-Dependent Pile Capacity Increase in Sensitive Soils
Keyword
NSERC
Application summary
Determination of ultimate pile capacity is important for proper design and construction of pile foundations. The pile capacity obtained from a load test, carried out shortly after the installation of pile, is often assumed to be the ultimate pile capacity in most design methods. However, the pile capacity could increase after installation as the excess pore pressure at the soil-pile interface dissipates. This time dependent increase in bearing capacity of piles, referred to as pile set-up, is not incorporated in current pile design. Therefore, current pile installation practice seems to be conservative as the contribution of capacity gain over time is neglected in the design.
The purpose of this collaborative research is to conduct experimental research aimed at developing a prediction system to estimate the pile capacity increase in soft and sensitive clays and to develop a relationship between the pile capacity and elapsed time after initial installation. The proposed research will involve a series of laboratory tests that will examine effects of soil type, loading rate, pile materials and installation method on pile capacity gain.
Prediction of pile capacity gain with time after driving would certainly be advantageous from economical standpoint. Incorporating the effects of set-up into pile design is expected to reduce the general cost of piling projects by reducing pile diameter, pile length, size of driving equipment, and subsequently piling duration. The knowledge and information can also be used during construction to choose a relevant time for a pile loading test.