Grant: Collaborative Research and Development Grants
University of Alberta
$102,180.00
Mobile crane selection, modular rigging optimization and on-site utilization for heavy industrial projects
EF 2014-15
Résumé
Canada is a leading energy producer, with the third-largest oil reserves in the world, and oil sands production as a major economic driver for the country. With world crude oil prices gradually rising, oil companies in Alberta are expanding their operations, devoting billions of dollars toward new production, maintenance, repair, and operations. Because oil sands production plants are generally congested areas, new assembly operations need to be carefully planned with regards to equipment location and operation in order to ensure optimal productivity. In the case of cranes, a well-designed operation includes selection, support system design, motion planning, and 3D validation. The objective of the research is thus threefold; it proposes to (i) elaborate a methodology which enables efficient planning of crane operations; (ii) design an appropriate support system and an innovative rigging mechanism; and (iii) analyze the impact of wind speed and direction on crane stability using the principles of fluid dynamics.The multi-disciplinary nature of the research will provide a unique opportunity for students, faculty, and managerial staff from the industrial partner to learn from each other and collaborate to achieve the research goal. This project also provides an opportunity for the industry partner and other players in the oil industry to further their insight into efficient scheduling and management of projects. The ensuing findings of the proposed research will serve as a basis for (i) reducing the risk of crane failure; (ii) improving safety of crane operation; (iii) increasing scheduling accuracy; and (iv) improving the efficiency of crane operations. The outcomes of the proposed research are also expected to make a positive impact on Canadian society. The developed measures to prevent equipment failure will result in significant savings by reducing the likelihood of work stoppage or equipment failure, and by contributing to the optimization of crane utilization on heavy industrial construction sites. This research also seeks to improve the safety and efficiency of crane operations, while reducing emissions.
Programme
Collaborative Research and Development Grants
Bénéficiaire
Emplacement
Alberta, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
461528-2013
Name nom
Bouferguene, Ahmed
Department département
Campus Saint-Jean
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2014
Competition year année de concours
2013
Award amount
102180
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Partie
1
Nb partie
2
Application title
Mobile crane selection, modular rigging optimization and on-site utilization for heavy industrial projects
Keyword
NSERC
Application summary
Canada is a leading energy producer, with the third-largest oil reserves in the world, and oil sands production as a major economic driver for the country. With world crude oil prices gradually rising, oil companies in Alberta are expanding their operations, devoting billions of dollars toward new production, maintenance, repair, and operations. Because oil sands production plants are generally congested areas, new assembly operations need to be carefully planned with regards to equipment location and operation in order to ensure optimal productivity. In the case of cranes, a well-designed operation includes selection, support system design, motion planning, and 3D validation. The objective of the research is thus threefold; it proposes to (i) elaborate a methodology which enables efficient planning of crane operations; (ii) design an appropriate support system and an innovative rigging mechanism; and (iii) analyze the impact of wind speed and direction on crane stability using the principles of fluid dynamics.The multi-disciplinary nature of the research will provide a unique opportunity for students, faculty, and managerial staff from the industrial partner to learn from each other and collaborate to achieve the research goal. This project also provides an opportunity for the industry partner and other players in the oil industry to further their insight into efficient scheduling and management of projects. The ensuing findings of the proposed research will serve as a basis for (i) reducing the risk of crane failure; (ii) improving safety of crane operation; (iii) increasing scheduling accuracy; and (iv) improving the efficiency of crane operations. The outcomes of the proposed research are also expected to make a positive impact on Canadian society. The developed measures to prevent equipment failure will result in significant savings by reducing the likelihood of work stoppage or equipment failure, and by contributing to the optimization of crane utilization on heavy industrial construction sites. This research also seeks to improve the safety and efficiency of crane operations, while reducing emissions.