Canada Spends Logo

Explorez notre analyse du budget 2026

Grant: Alliance Grants

University of Windsor

$125,000.00

Investigate the feasibility of low impact development (LID) controls in clay soils in managing the stormwater linear infrastructure

EF 2024-25

Résumé
Stormwater infrastructure management, one of the most important tasks of the municipalities, involves managing the stormwater runoff quantity and quality by controlling flooding, reducing the pollutant loadings, and ensuring public safety. Stormwater management under climate change conditions has become even more challenging. Under the City of Windsor's (City's) Final Agreement for Consolidated Linear Infrastructure Environmental Compliance Approval (Final CLI ECA Agreement), the Ontario Ministry of Environment, Conservation and Parks (MECP) mandates water balance (WB) requirements for new developments and retrofit scenarios in already developed areas. MECP requires municipalities to manage stormwater runoff volume through WB control measures, to match pre-development conditions or to the 90th percentile storm event through the use of Low Impact Development (LID) controls, such as infiltration trenches, permeable pavement, rain gardens, and bioretention cells. In the case of Windsor, the 90th percentile storm event is equal to 30 mm of rainfall. However, it is not clear if the City could retain 30 mm of the rainfall given the prevailing clay soils. The objective of the present partnership between the City and the University of Windsor is to assess the feasibility and effectiveness of Low Impact Development (LID) controls in managing stormwater in Windsor's low permeable clay soils which pose challenges. If it is not possible to retain 30 mm of rainfall, the secondary objective is to determine the magnitude of the rainfall that can be retained in the sewershed. To decide the most suitable combinations of LID controls to manage urban stormwater sustainably, it is proposed carry out an integrated field investigations and modelling study. It is aimed to apply a coupled optimization-simulation model by linking the SWMM 5 model to the Borg Multiobjective Evolutionary Algorithm to identify the best possible combinations of LID controls in both public and private properties in an urban sewershed in Windsor, Ontario. The proposed study is very important for the City to develop the policy on LID implementation in Windsor to meet the MECP's CLI agreement.
Programme
Alliance Grants
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
600822-2024
Name nom
Bolisetti, Tirupati T
Department département
Civil and Environmental Engineering
Organization id
37
Institution établissement
University of Windsor
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2024
Competition year année de concours
2024
Award amount
125000
Program id
ALLRP
Program name en
Alliance Grants
Program name fr
Subventions Alliance
Group en
RESEARCH PARTNERSHIPS
Group fr
PARTENARIATS DE RECHERCHE
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
702
Area of application group en
Transportation systems and services
Area of application group fr
Services et systèmes de transport
Area of application en
Water
Area of application fr
Maritime
Research subject code
1006
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Hydrologic engineering
Research subject fr
Génie hydrologique
Field of research list names en
Not available
Field of research list names fr
Non disponible
Socioeconomic objective list names en
Not available
Socioeconomic objective list names fr
Non disponible
Application title
Investigate the feasibility of low impact development (LID) controls in clay soils in managing the stormwater linear infrastructure
Keywords
clay soils; consolidate linear infrastructure; low impact development controls; mathematical modelling; urban hydrology
Application summary
Stormwater infrastructure management, one of the most important tasks of the municipalities, involves managing the stormwater runoff quantity and quality by controlling flooding, reducing the pollutant loadings, and ensuring public safety. Stormwater management under climate change conditions has become even more challenging. Under the City of Windsor's (City's) Final Agreement for Consolidated Linear Infrastructure Environmental Compliance Approval (Final CLI ECA Agreement), the Ontario Ministry of Environment, Conservation and Parks (MECP) mandates water balance (WB) requirements for new developments and retrofit scenarios in already developed areas. MECP requires municipalities to manage stormwater runoff volume through WB control measures, to match pre-development conditions or to the 90th percentile storm event through the use of Low Impact Development (LID) controls, such as infiltration trenches, permeable pavement, rain gardens, and bioretention cells. In the case of Windsor, the 90th percentile storm event is equal to 30 mm of rainfall. However, it is not clear if the City could retain 30 mm of the rainfall given the prevailing clay soils. The objective of the present partnership between the City and the University of Windsor is to assess the feasibility and effectiveness of Low Impact Development (LID) controls in managing stormwater in Windsor's low permeable clay soils which pose challenges. If it is not possible to retain 30 mm of rainfall, the secondary objective is to determine the magnitude of the rainfall that can be retained in the sewershed. To decide the most suitable combinations of LID controls to manage urban stormwater sustainably, it is proposed carry out an integrated field investigations and modelling study. It is aimed to apply a coupled optimization-simulation model by linking the SWMM 5 model to the Borg Multiobjective Evolutionary Algorithm to identify the best possible combinations of LID controls in both public and private properties in an urban sewershed in Windsor, Ontario. The proposed study is very important for the City to develop the policy on LID implementation in Windsor to meet the MECP's CLI agreement.