Canada Spends Logo

Explorez notre analyse du budget 2026

Grant: Discovery Grants Program - Individual

University of Alberta

$26,000.00

Automation of Construction Operations through Modular and Offsite Technologies

EF 2013-14

Résumé
The on-site stick-built construction process is hindered by inefficiency, material and process waste, and a significant environmental impact. This process limits technological and productivity innovations, as well as the ability of discipline-specific professionals to communicate information and knowledge. The objective of the proposed program is to support the manufacturing-based construction process by narrowing the gap between engineering, manufacturing, and on-site installation. The program will utilize 3D modeling of facilities, a process which capitalizes on a manufacturing approach in order to establish improved design and construction methods. This research seeks to establish innovative solutions by front-loading the 3D-model with information utilizing Building Information Modeling (BIM).Based on research within a BIM-based 3D-modeling framework, significant advancements are expected with respect to the following objectives: (1) automation of design and drafting for manufacturing; (2) efforts to increase productivity and flexibility of the building manufacturing system; (3) ergonomic analysis, as well as assessment of the physical demands of construction activities on workers; (4) development of mathematical algorithms to optimize material usage, as well as to minimize construction material waste; and (5) quantification and suggestion of steps towards the reduction of the CO2 footprint of the construction process. Advances are expected in terms of increased productivity, enhanced automation, materials optimization, reduced environmental impact, and the mitigation of health and safety risks by virtue of this 3D-model-based research.
Programme
Discovery Grants Program - Individual
Bénéficiaire
Emplacement
Alberta, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
249661-2013
Name nom
AlHussein, Mohamed
Department département
Civil and Environmental Engineering
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2013
Competition year année de concours
2013
Award amount
26000
Program id
RGPIN
Program name en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
Discovery grants programs
Group fr
Programmes de subventions à la découverte
Committee code
1509
Committee name en
Civil, Industrial and Systems Engineering
Committee name fr
Génie civil, industriel et des systèmes
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Partie
1
Nb partie
5
Application title
Automation of Construction Operations through Modular and Offsite Technologies
Keyword
NSERC
Application summary
The on-site stick-built construction process is hindered by inefficiency, material and process waste, and a significant environmental impact. This process limits technological and productivity innovations, as well as the ability of discipline-specific professionals to communicate information and knowledge. The objective of the proposed program is to support the manufacturing-based construction process by narrowing the gap between engineering, manufacturing, and on-site installation. The program will utilize 3D modeling of facilities, a process which capitalizes on a manufacturing approach in order to establish improved design and construction methods. This research seeks to establish innovative solutions by front-loading the 3D-model with information utilizing Building Information Modeling (BIM).Based on research within a BIM-based 3D-modeling framework, significant advancements are expected with respect to the following objectives: (1) automation of design and drafting for manufacturing; (2) efforts to increase productivity and flexibility of the building manufacturing system; (3) ergonomic analysis, as well as assessment of the physical demands of construction activities on workers; (4) development of mathematical algorithms to optimize material usage, as well as to minimize construction material waste; and (5) quantification and suggestion of steps towards the reduction of the CO2 footprint of the construction process. Advances are expected in terms of increased productivity, enhanced automation, materials optimization, reduced environmental impact, and the mitigation of health and safety risks by virtue of this 3D-model-based research.