Grant: Engage Plus Grants Program
University of Guelph
$12,498.00
Integrated Production and Manpower Scheduling - Second Phase
EF 2017-18
Résumé
Most published articles in scheduling research are focused in developing models and algorithms to theoreticalproblems having limited applications. The scheduling problem identified in the collaborating company happensto be very different from those know in literature. It involves the scheduling of a large variety of orders withgreater operational complexity. Many of the operations on the products are to be processed unit by unit.However, most products also need to passes through a batch processing facility with apparent complexity toincorporate in a scheduling model. Moreover, products need both machining and assembly operations wherecomponents and sub-assemblies need to pass through many processing stations. Some of the products haveoperations that are outsourced and their semi-finished inventory needs to be sent to other facilities and bereturned for further in-house processing. Machine operators are limited resources. Many of these operators arecross trained and can be assigned to different types of machines. Operators may also tend more than onemachine at a time. Hence their task need to be scheduled in details along the operations. Critical segments ofthe manufacturing facility are operated multiple shift or overtime while the rest are operated only a single shift.These unique combination of problem features makes scheduling very difficult. Hence, the company faces achallenge in running its operations smoothly with minimal work-in-process inventory while at the same timemeeting product delivery dates. A preliminary study was conducted to develop an efficient schedulingtechnique based on Event Scheduling/Time Advance (ESTA) algorithm. The approach proves to be capable ofhandling many of the operational logic of the manufacturing facility and generate schedules for the machinesand the operators, and optimize several performance criteria. This research is a continuation of thisachievement and is aimed at enhancing the developed algorithm to incorporate several details of themanufacturing system. Moreover, a limited study will be conducted for integrating production scheduling withother operational issues such as inventory management and maintenance planning.
Programme
Engage Plus Grants Program
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
508407-2017
Name nom
Defersha, Fantahun
Department département
Engineering, School of
Organization id
24
Institution établissement
University of Guelph
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2017
Competition year année de concours
2017
Award amount
12498
Program id
EGP2
Program name en
Engage Plus Grants Program
Program name fr
Programme de subvention d'engagement partenarial Plus
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1553
Committee name en
Ontario Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Ontario
Area of application code
1206
Area of application group en
Advancement of knowledge
Area of application group fr
Avancement des connaissances
Area of application en
Engineering
Area of application fr
Génie
Research subject code
1606
Research subject group en
Industrial engineering
Research subject group fr
Génie industriel
Research subject en
Operations management
Research subject fr
Gestion de la production
Partie
1
Nb partie
1
Application title
Integrated Production and Manpower Scheduling - Second Phase
Keyword
NSERC
Application summary
Most published articles in scheduling research are focused in developing models and algorithms to theoreticalproblems having limited applications. The scheduling problem identified in the collaborating company happensto be very different from those know in literature. It involves the scheduling of a large variety of orders withgreater operational complexity. Many of the operations on the products are to be processed unit by unit.However, most products also need to passes through a batch processing facility with apparent complexity toincorporate in a scheduling model. Moreover, products need both machining and assembly operations wherecomponents and sub-assemblies need to pass through many processing stations. Some of the products haveoperations that are outsourced and their semi-finished inventory needs to be sent to other facilities and bereturned for further in-house processing. Machine operators are limited resources. Many of these operators arecross trained and can be assigned to different types of machines. Operators may also tend more than onemachine at a time. Hence their task need to be scheduled in details along the operations. Critical segments ofthe manufacturing facility are operated multiple shift or overtime while the rest are operated only a single shift.These unique combination of problem features makes scheduling very difficult. Hence, the company faces achallenge in running its operations smoothly with minimal work-in-process inventory while at the same timemeeting product delivery dates. A preliminary study was conducted to develop an efficient schedulingtechnique based on Event Scheduling/Time Advance (ESTA) algorithm. The approach proves to be capable ofhandling many of the operational logic of the manufacturing facility and generate schedules for the machinesand the operators, and optimize several performance criteria. This research is a continuation of thisachievement and is aimed at enhancing the developed algorithm to incorporate several details of themanufacturing system. Moreover, a limited study will be conducted for integrating production scheduling withother operational issues such as inventory management and maintenance planning.