Contribution: Disaster Mitigation and Adaptation Fund
Ministry of Municipal Affairs and housing | Ministère des Affaires municipales et de l’Habitation
$21,280,000.00
Construction of a retaining structure intended to reduce overflows during heavy rains (Ouvrage St-Thomas)
EF 2024-25 · 2024-12-18
Résumé
A retention structure allows for the temporary storage of wastewater during very heavy rainfalls in order to avoid a backflow into the network or a discharge into the natural environment. This project consists of the construction of a 15,000 m³ retention structure in the Griffintown sector, more precisely in the quadrilateral between William, Ottawa, St-Thomas and du Séminaire streets. The site chosen for the implementation of the retention basin allows an optimal control of overflows and ensures a better hydraulic protection for the residents of the sector. This structure will be built in an area of approximately 500 hectares of downtown Montreal that is undergoing development and densification of its occupation.
Programme
Disaster Mitigation and Adaptation FundDisaster Mitigation and Adaptation Fund (lien de confiance élevée)
Bénéficiaire
Emplacement
Québec, City of | Québec, Ville de, Quebec, Canada
Type de bénéficiaire
Government
Type
Contribution
Source
Proactive Disclosure - Grants and Contributions
Tel que publié
Additional Information
Multi-year award for fiscal years 2024-25 to 2029-30.
Additional Information (French)
Contribution pluriannuelle pour les exercices financiers 2024-25 à 2029-30.
Agreement End Date
2030-03-31
Agreement Start Date
2024-12-18
Agreement Title
Construction of a retaining structure intended to reduce overflows during heavy rains (Ouvrage St-Thomas)
Agreement Title (French)
Construction d’un ouvrage de rétention visant la diminution des surverses lors de pluies abondantes (ouvrage St-Thomas)
Agreement Type
Contribution
Agreement Value
$21,280,000.00
Amendment Number
0
Description
A retention structure allows for the temporary storage of wastewater during very heavy rainfalls in order to avoid a backflow into the network or a discharge into the natural environment. This project consists of the construction of a 15,000 m³ retention structure in the Griffintown sector, more precisely in the quadrilateral between William, Ottawa, St-Thomas and du Séminaire streets. The site chosen for the implementation of the retention basin allows an optimal control of overflows and ensures a better hydraulic protection for the residents of the sector. This structure will be built in an area of approximately 500 hectares of downtown Montreal that is undergoing development and densification of its occupation.
Description (French)
Un ouvrage de rétention permet d’emmagasiner temporairement les eaux usées lors de très fortes précipitations afin d’éviter un refoulement dans le réseau ou un déversement dans le milieu naturel. Ce projet consiste à construire un ouvrage de rétention d’environ 15 000 m³ dans le secteur Griffintown plus précisément dans le quadrilatère compris entre les rues William, Ottawa, St-Thomas et du Séminaire. Le site choisi pour l’implantation du bassin de retenue permet un contrôle des débordements optimal et assure une meilleure protection hydraulique aux résidents du secteur. Cet ouvrage sera construit dans un secteur d’environ 500 hectares du centre-ville de Montréal qui fait l’objet d’un développement et d’une densification de son occupation.
Organization Code
infc
Organization
Department of Housing, Infrastructure and Communities | Ministère du Logement, de l’Infrastructure et des Collectivités
Program Name
Disaster Mitigation and Adaptation Fund
Program Name (French)
Fonds d'atténuation et d'adaptation en matière de catastrophe
Recipient City
Québec, City of | Québec, Ville de
Recipient Country
CA
Recipient Legal Name
Ministry of Municipal Affairs and housing | Ministère des Affaires municipales et de l’Habitation
Recipient Province or Territory
QC
Reference Number
278-2024-2025-Q3-00009