Grant: Collaborative Research and Development Grants
University of Toronto
$71,428.00
Improving the construction of tall buildings
EF 2017-18
Résumé
Canada is a leader in the construction of tall buildings in North America. In the Toronto area, the type of tall buildings constructed has changed dramatically in the past 15 years. Before 2000, 90% of tall buildings were offices; today, 90% are residential. This change has challenged the construction industry as residential high-rises are much more complex than office structures of similar height. For example, while office buildings require minimal interior finishes to allow for maximum flexibility for potential tenants, residential units must be completely finished. Further, office spaces are served by central heating, cooling, and ventilation (HVAC) systems whereas residential units often have individual HVAC systems and have operable doors and windows to connect residents to the outside. These differences significantly affect the energy consumption and construction requirements of the units.This research aims to address the many issues being experienced by high-rise residential builders. Three main topics will be examined: productivity during construction, construction impacts on stack effect, and, a life cycle evaluation of modular cladding systems. These three topics were identified as pressing needs by the industry.
Programme
Collaborative Research and Development Grants
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
479087-2015
Name nom
McCabe, Brenda
Department département
Civil Engineering
Organization id
31
Institution établissement
University of Toronto
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2017
Competition year année de concours
2015
Award amount
71428
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Partie
3
Nb partie
3
Application title
Improving the construction of tall buildings
Keyword
NSERC
Application summary
Canada is a leader in the construction of tall buildings in North America. In the Toronto area, the type of tall buildings constructed has changed dramatically in the past 15 years. Before 2000, 90% of tall buildings were offices; today, 90% are residential. This change has challenged the construction industry as residential high-rises are much more complex than office structures of similar height. For example, while office buildings require minimal interior finishes to allow for maximum flexibility for potential tenants, residential units must be completely finished. Further, office spaces are served by central heating, cooling, and ventilation (HVAC) systems whereas residential units often have individual HVAC systems and have operable doors and windows to connect residents to the outside. These differences significantly affect the energy consumption and construction requirements of the units.This research aims to address the many issues being experienced by high-rise residential builders. Three main topics will be examined: productivity during construction, construction impacts on stack effect, and, a life cycle evaluation of modular cladding systems. These three topics were identified as pressing needs by the industry.