Grant: Collaborative Research and Development Grants

University of Calgary

$108,267.00

Dynamic Line Rating Solutions for Alberta

EF 2017-18

Résumé
Alberta's Interconnected Electrical System is undergoing a period of substantial change. The AlbertaGovernment has indicated that it plans to retire coal generation in Alberta by 2030, with 50%-75% of the coalcapacity being replaced with renewable sources; coal-based generation currently accounts for approximately40% of generating capacity and over half of all electrical energy production. As this change to generation fleetoccurs, Alberta is also expected to experience a rapid growth in population and industrial sector energydemand, requiring expansion of the overall capacity of the Alberta Interconnected Electrical System (AIES).The Climate Leadership Report envisages a system with 30% of generating capacity from renewable sourceswithin 14 years, with the remainder of capacity likely provided by gas-fired generation. The expected increasein growth and substantial change to generating sources present challenges to the design of a suitabletransmission system. These challenges are compounded by policy and regulations, which require that allin-merit generation must be accepted without constraint, a lengthy regulatory approval process for newtransmission, and the high cost to build or upgrade lines. For these reasons, the independent system operator(AESO) and transmission facility owners (TFO's) in Alberta are interested in approaches that maximize theutilization of transmission systems such that Alberta has a cost-effective, safe and reliable electrical supply.One approach to maximize transmission utilization is to dynamically operate systems to the safe limit of theexisting environmental conditions at the time, known as dynamic line rating (DLR). The project brings togethersenior Professors in Electrical, Computer and Mechanical Engineering to investigate how best to predict theenvironmental conditions across multiple spans of a transmission line, and how to use those environmentalconditions to predict the real-time ampacity of the transmission line. The project will work develop practicalsolutions, demonstrating the value of DLR to the system.
Programme
Collaborative Research and Development Grants
Bénéficiaire
Emplacement
Alberta, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
500547-2016
Name nom
Knight, Andrew
Department département
Electrical and Computer Engineering
Organization id
11
Institution établissement
University of Calgary
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2017
Competition year année de concours
2016
Award amount
108267
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
304
Area of application group en
Energy resources
Area of application group fr
Ressources d'énergie
Area of application en
Electrical energy
Area of application fr
Énergie électrique
Research subject code
2501
Research subject group en
Electrical and electronic engineering
Research subject group fr
Génie électrique et électronique
Research subject en
Power systems
Research subject fr
Réseaux électriques
Partie
2
Nb partie
4
Application title
Dynamic Line Rating Solutions for Alberta
Keyword
NSERC
Application summary
Alberta's Interconnected Electrical System is undergoing a period of substantial change. The AlbertaGovernment has indicated that it plans to retire coal generation in Alberta by 2030, with 50%-75% of the coalcapacity being replaced with renewable sources; coal-based generation currently accounts for approximately40% of generating capacity and over half of all electrical energy production. As this change to generation fleetoccurs, Alberta is also expected to experience a rapid growth in population and industrial sector energydemand, requiring expansion of the overall capacity of the Alberta Interconnected Electrical System (AIES).The Climate Leadership Report envisages a system with 30% of generating capacity from renewable sourceswithin 14 years, with the remainder of capacity likely provided by gas-fired generation. The expected increasein growth and substantial change to generating sources present challenges to the design of a suitabletransmission system. These challenges are compounded by policy and regulations, which require that allin-merit generation must be accepted without constraint, a lengthy regulatory approval process for newtransmission, and the high cost to build or upgrade lines. For these reasons, the independent system operator(AESO) and transmission facility owners (TFO's) in Alberta are interested in approaches that maximize theutilization of transmission systems such that Alberta has a cost-effective, safe and reliable electrical supply.One approach to maximize transmission utilization is to dynamically operate systems to the safe limit of theexisting environmental conditions at the time, known as dynamic line rating (DLR). The project brings togethersenior Professors in Electrical, Computer and Mechanical Engineering to investigate how best to predict theenvironmental conditions across multiple spans of a transmission line, and how to use those environmentalconditions to predict the real-time ampacity of the transmission line. The project will work develop practicalsolutions, demonstrating the value of DLR to the system.