Canada Spends Logo

Explorez notre analyse du budget 2026

Grant: Engage Grants Program

Concordia University

$25,000.00

Development of a smart design system

EF 2017-18

Résumé
The primary advantages of industrialization of the construction process (modular and offsite method) are anenvironmentally-friendly construction process, short completion time, and cost-competitive technology. Fortislight gauge steel (LGS) Structures Inc. focuses on producing walls and bath units in their factory and then shipsthem to sites for installation. Since their core value is to reduce onsite construction time while improving thequality of the delivered product, the management team has focused on reducing the cycle time of theprefabrication process in the factory for better productivity. However, its full potential in terms of productivityimprovement has not yet been realized since labour-intensive tasks in the manufacturing process entail manynon-value added activities which its completion is heavily reliant on worker intuition and experience due to thelack of architectural and structural information (i.e., cutting patterns for boarding design) in the shop drawings.In this respect, the guesswork and rules of thumb are replaced with scientific and engineering sequences oftasks for productivity improvement. We thus propose an integrated solution which has the followingprocedures: (1) identification of issues such as lack of design information or heavy physical demands whichmay cause productivity and safety reduction; (2) development of a framework for estimating cycle time andefficiency evaluation to establish correlation factors which affects safety and productivity between constructionmethods (operational variables), sequences of tasks (physical demand variables), and design variables such asdimensions of walls and of opening space; and (3) development of a smart design system which determinessheathing and drywall sheet layout on wall panels by optimize engineering (e.g. boarding sheet layout) andphysical demand (e.g. minimum posture risk) factors. The proposed system will minimize wastes(non-value-adding activities) of tasks and material utilization. The smart design system is expected to beimplemented in order to improve productivity and safety of the Fortis manufacturing process.
Programme
Engage Grants Program
Bénéficiaire
Emplacement
Quebec, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
509490-2017
Name nom
Han, SangHyeok
Department département
Building, Civil and Environmental Engineering
Organization id
70
Institution établissement
Concordia University
Province en
Québec
Province fr
Québec
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2017
Competition year année de concours
2017
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1552
Committee name en
Quebec Internal Decision Committee
Committee name fr
Comité de décision interne pour le Québec
Area of application code
1001
Area of application group en
Northern development
Area of application group fr
Développement du nord
Area of application en
Construction, transportation and communications
Area of application fr
Construction, transports et communications
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Partie
1
Nb partie
1
Application title
Development of a smart design system
Keyword
NSERC
Application summary
The primary advantages of industrialization of the construction process (modular and offsite method) are anenvironmentally-friendly construction process, short completion time, and cost-competitive technology. Fortislight gauge steel (LGS) Structures Inc. focuses on producing walls and bath units in their factory and then shipsthem to sites for installation. Since their core value is to reduce onsite construction time while improving thequality of the delivered product, the management team has focused on reducing the cycle time of theprefabrication process in the factory for better productivity. However, its full potential in terms of productivityimprovement has not yet been realized since labour-intensive tasks in the manufacturing process entail manynon-value added activities which its completion is heavily reliant on worker intuition and experience due to thelack of architectural and structural information (i.e., cutting patterns for boarding design) in the shop drawings.In this respect, the guesswork and rules of thumb are replaced with scientific and engineering sequences oftasks for productivity improvement. We thus propose an integrated solution which has the followingprocedures: (1) identification of issues such as lack of design information or heavy physical demands whichmay cause productivity and safety reduction; (2) development of a framework for estimating cycle time andefficiency evaluation to establish correlation factors which affects safety and productivity between constructionmethods (operational variables), sequences of tasks (physical demand variables), and design variables such asdimensions of walls and of opening space; and (3) development of a smart design system which determinessheathing and drywall sheet layout on wall panels by optimize engineering (e.g. boarding sheet layout) andphysical demand (e.g. minimum posture risk) factors. The proposed system will minimize wastes(non-value-adding activities) of tasks and material utilization. The smart design system is expected to beimplemented in order to improve productivity and safety of the Fortis manufacturing process.