Load demand management with high renewable energy penetration in distribution systems

EF 2017-18

Résumé
Distributed Renewable Resources (DRRs) differ from conventional and fossil-fired resources in a fundamental way. Their sources (wind velocity and solar radiation in particular) cannot be controlled or stored. Further, renewable power generation often does not correlate with consumer load demand in real time due to its high intermittency. It may lead to one of the main causes of destabilizing the power system. In light of increased penetrations of these DRRs (50-60%) with the future grid, it will be difficult even for conventional power plants to participate effectively with great impact in maintaining stability of the network. In such reformed grid structure with high DRRs penetration, it will become a real challenging task to instantaneously predict and control total power generation in the entire grid. The operation of power grid will be more deliberately governed on the basis of DRRs generation rather than consumer loads demand. The main problems which may arise are increased voltage distortions in terms of flicker, sag, swell and its harmonic contents, frequency control etc. To solve such problems, solutions are presented in literature, such as, increased rating of a stand-by DG unit and employing storage system for maintaining deficit real time load demands. The demand side management is alternative solution for mitigating intermittency of the DRRs in the power system. The load power consumption is controlled such that load demand follow power generation. Load demand management methods are classified as load scheduling, use of energy storage systems (ESS), direct on-off control of non-critical loads etc. However most of these methods are suitable for load management in time frame of hours. They do not work in real time, except with the use of ESS. Recently, electric spring (ES) concept has been proposed as a smart load for demand management in real time. However, it has not been analyzed very much in terms of its design, efficient control and its worthiness under high penetration of wind and solar PV generation with distribution systems. Moreover, in near future, energy demand is expected to increase rapidly in the sector of transportation to supply plug-in electrical vehicles (PEVs). These charging stations of PEVs may be used as flexible loads to stabilize the grid. In view of these challenges, there is an immediate requirement for detailed investigation for technologies with distribution system to mitigate intermittency of DRRs. The main objectives of the proposed research project are as follows, Design, modeling, control, implementation and performance evaluation of selected topologies of smart loads to achieve loss minimization, technical upgradation, size reduction under increased penetrations of DRRs. Design, modeling and control for scheduling the dispatch of parking stations for PEVs under increased penetrations of DRRs to improve grid stability and customer satisfaction.
Programme
Discovery Grants Program - Individual
Emplacement
Quebec, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
RGPIN-2016-04580
Name nom
Chandra, Ambrish
Department département
Génie électrique - Génie électrique
Organization id
53
Institution établissement
École de technologie supérieure
Province en
Québec
Province fr
Québec
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2017
Competition year année de concours
2016
Award amount
41000
Program id
RGPIN
Program name en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
Discovery grants programs
Group fr
Programmes de subventions à la découverte
Committee code
1510
Committee name en
Electrical and Computer Engineering
Committee name fr
Génie électrique et informatique
Area of application code
513
Area of application group en
Manufacturing processes and products
Area of application group fr
Procédés et produits industriels
Area of application en
Electrical and electronic machinery and equipment (including computer hardware)
Area of application fr
Machinerie et équipement électriques et électroniques (y compris matériel informatique)
Research subject code
2516
Research subject group en
Electrical and electronic engineering
Research subject group fr
Génie électrique et électronique
Research subject en
Energy conversion and distribution
Research subject fr
Conversion et distribution de l'énergie
Partie
2
Nb partie
5
Application title
Load demand management with high renewable energy penetration in distribution systems
Keyword
NSERC
Application summary
Distributed Renewable Resources (DRRs) differ from conventional and fossil-fired resources in a fundamental way. Their sources (wind velocity and solar radiation in particular) cannot be controlled or stored. Further, renewable power generation often does not correlate with consumer load demand in real time due to its high intermittency. It may lead to one of the main causes of destabilizing the power system. In light of increased penetrations of these DRRs (50-60%) with the future grid, it will be difficult even for conventional power plants to participate effectively with great impact in maintaining stability of the network. In such reformed grid structure with high DRRs penetration, it will become a real challenging task to instantaneously predict and control total power generation in the entire grid. The operation of power grid will be more deliberately governed on the basis of DRRs generation rather than consumer loads demand. The main problems which may arise are increased voltage distortions in terms of flicker, sag, swell and its harmonic contents, frequency control etc. To solve such problems, solutions are presented in literature, such as, increased rating of a stand-by DG unit and employing storage system for maintaining deficit real time load demands. The demand side management is alternative solution for mitigating intermittency of the DRRs in the power system. The load power consumption is controlled such that load demand follow power generation. Load demand management methods are classified as load scheduling, use of energy storage systems (ESS), direct on-off control of non-critical loads etc. However most of these methods are suitable for load management in time frame of hours. They do not work in real time, except with the use of ESS. Recently, electric spring (ES) concept has been proposed as a smart load for demand management in real time. However, it has not been analyzed very much in terms of its design, efficient control and its worthiness under high penetration of wind and solar PV generation with distribution systems. Moreover, in near future, energy demand is expected to increase rapidly in the sector of transportation to supply plug-in electrical vehicles (PEVs). These charging stations of PEVs may be used as flexible loads to stabilize the grid. In view of these challenges, there is an immediate requirement for detailed investigation for technologies with distribution system to mitigate intermittency of DRRs. The main objectives of the proposed research project are as follows, Design, modeling, control, implementation and performance evaluation of selected topologies of smart loads to achieve loss minimization, technical upgradation, size reduction under increased penetrations of DRRs. Design, modeling and control for scheduling the dispatch of parking stations for PEVs under increased penetrations of DRRs to improve grid stability and customer satisfaction.