Grant: Engage Grants Program
University of Toronto
$24,980.00
Improving blast-induced rock fragmentation in Milton Quarry
EF 2017-18
Résumé
The proposed research project aims to improve the blasting process in Milton quarry by integrating advancedmonitoring and instrumentation techniques. A geophysical ground penetrating radar will be used tocharacterize the spatial variation of open voids in the limestone rock mass at the quarry site. These voids arecausing the escape of explosive energy and consequently a poor rock fragmentation. Moreover, an aerialmethod based on Unmanned Aerial Vehicle technology will be used to characterize the geometrical rockstructural characteristics which will be used to estimate the in-situ block size distribution of rock mass. Theinformation on spatial variation of open voids and discontinuties within the rock mass will be used as input tobuild a 3D structural model for the rock mass using Discrete Fracture Network model. The model allowsimproving the practice of decking blast in the quarry. The drone technology will be used to measure thepost-blast rock size distribution using image analysis. This allows assessing the effectivness of the blastdecking modification on the blast-induced fragmentation size distribution. Using advanced instrumentation andmonitoring techniques together with the state of the art structural modeling approach will allow improvment ofblasting outcomes at Milton quarry.
Programme
Engage Grants Program
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
514506-2017
Name nom
Esmaeili, Kamran
Department département
Civil Engineering
Organization id
31
Institution établissement
University of Toronto
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2017
Competition year année de concours
2017
Award amount
24980
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1553
Committee name en
Ontario Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Ontario
Area of application code
202
Area of application group en
Natural resources (economic aspects)
Area of application group fr
Ressources naturelles (aspects économiques)
Area of application en
Mineral resources ( prospecting, exploration, mining, extraction, processing)
Area of application fr
Ressources minérales (prospection, exploration, mines, extraction et préparation)
Research subject code
1401
Research subject group en
Mining and mineral processing
Research subject group fr
Génie minier et minéral
Research subject en
Mining engineering
Research subject fr
Génie minier
Partie
1
Nb partie
1
Application title
Improving blast-induced rock fragmentation in Milton Quarry
Keyword
NSERC
Application summary
The proposed research project aims to improve the blasting process in Milton quarry by integrating advancedmonitoring and instrumentation techniques. A geophysical ground penetrating radar will be used tocharacterize the spatial variation of open voids in the limestone rock mass at the quarry site. These voids arecausing the escape of explosive energy and consequently a poor rock fragmentation. Moreover, an aerialmethod based on Unmanned Aerial Vehicle technology will be used to characterize the geometrical rockstructural characteristics which will be used to estimate the in-situ block size distribution of rock mass. Theinformation on spatial variation of open voids and discontinuties within the rock mass will be used as input tobuild a 3D structural model for the rock mass using Discrete Fracture Network model. The model allowsimproving the practice of decking blast in the quarry. The drone technology will be used to measure thepost-blast rock size distribution using image analysis. This allows assessing the effectivness of the blastdecking modification on the blast-induced fragmentation size distribution. Using advanced instrumentation andmonitoring techniques together with the state of the art structural modeling approach will allow improvment ofblasting outcomes at Milton quarry.