Grant: Engage Grants Program
University of Toronto
$25,000.00
Permeable interlocking concrete paver lot performance quantification for short-term installation and maintenance concerns
EF 2015-16
Résumé
Concrete pavers are a popular hardscaping product as they create attractive surfaces and are long-lasting.
Increasingly pavers are being used for more than just aesthetics but are design to be permeable and allow for
rainwater to infiltrate into underlying soils. Permeable interlocking concrete pavers (PICP) are an on-site
engineered stormwater management system. Site level stormwater management controls can mitigate flooding
risks by restoring naturalized processes such as infiltration and providing distributed storage of stormwater. In
order to ensure the long-term functionality of PICP there is a need to address installer related issues and to
develop well defined standards and guidelines. Over time PICP losses its ability to infiltrate stormwater as
surface openings gradually become clogged with sediment. Cost effective maintenance practices to rejuvenate
surface infiltration capacity still need to be developed. In this project the Canada Masonry Design Centre will
convert 175 sqm of existing walkways to PICP. The experimental pavement will be used to investigate the the
impact of stormwater detention time for PICP on quantity control of stormwater, water quality concerns from
the 'first flush' after construction as well as performance in the first winter after construction. Three detention
practices will be tested: (1) free release, (2) twenty-four hour detention, (3) forty-eight hour detention. Results
of this research will be integrated into draft installation and operation standards to be developed by CMDC.
Programme
Engage Grants Program
Bénéficiaire
Emplacement
Ontario, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
485909-2015
Name nom
Drake, Jennifer
Department département
Civil Engineering
Organization id
31
Institution établissement
University of Toronto
Province en
Ontario
Province fr
Ontario
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2015
Competition year année de concours
2015
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1553
Committee name en
Ontario Internal Decision Committee
Committee name fr
Comité de décision interne pour l'Ontario
Area of application code
400
Area of application group en
Environment
Area of application group fr
Environnement
Area of application en
Environment
Area of application fr
Environnement
Research subject code
1006
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Hydrologic engineering
Research subject fr
Génie hydrologique
Partie
1
Nb partie
1
Application title
Permeable interlocking concrete paver lot performance quantification for short-term installation and maintenance concerns
Keyword
NSERC
Application summary
Concrete pavers are a popular hardscaping product as they create attractive surfaces and are long-lasting.
Increasingly pavers are being used for more than just aesthetics but are design to be permeable and allow for
rainwater to infiltrate into underlying soils. Permeable interlocking concrete pavers (PICP) are an on-site
engineered stormwater management system. Site level stormwater management controls can mitigate flooding
risks by restoring naturalized processes such as infiltration and providing distributed storage of stormwater. In
order to ensure the long-term functionality of PICP there is a need to address installer related issues and to
develop well defined standards and guidelines. Over time PICP losses its ability to infiltrate stormwater as
surface openings gradually become clogged with sediment. Cost effective maintenance practices to rejuvenate
surface infiltration capacity still need to be developed. In this project the Canada Masonry Design Centre will
convert 175 sqm of existing walkways to PICP. The experimental pavement will be used to investigate the the
impact of stormwater detention time for PICP on quantity control of stormwater, water quality concerns from
the 'first flush' after construction as well as performance in the first winter after construction. Three detention
practices will be tested: (1) free release, (2) twenty-four hour detention, (3) forty-eight hour detention. Results
of this research will be integrated into draft installation and operation standards to be developed by CMDC.