Canada Spends Logo

Explorez notre analyse du budget 2026

Grant: Strategic Workshops Program

University of Alberta

$25,000.00

Integrated Modular and Offsite Construction Approaches: Architectural Design and Project Procurement & Financing Workshop

EF 2012-13

Résumé
The current on-site stick-built construction process is hampered by inefficiency, material/energy waste, a large carbon footprint, and health repercussions for workers and building residents. In contrast, industrialization in building construction reduces costs and construction time, generates higher quality products, and creates healthier environments for workers and occupants. Ultimately, replacing on-site building with modular and off-site construction will increase productivity and flexibility of the building manufacturing system, automate design and drafting for manufacturing (DDFM), optimize material usage/minimize waste, and decrease environmental footprint (CO2 emissions). Although many entities can benefit from industrialized building, including owners (private and public sector), institutions (schools and hospitals), general contractors, and architectural/engineering organizations, increased communication and collaboration is required to realize these benefits fully. As modular and off-site technology continues to evolve, the need to inform and engage all project stakeholders in every phase of the project grows increasingly relevant. To address this need, the proposed workshop will function as a networking event, involving the construction industry, public sector, and academic community in a productive dialogue about the potential and current limitations of modular and off-site construction. More specifically, the workshop will focus on two topics: 1) Architectural Design Integration Paradigm and 2) Project Procurement & Financing. Both topics will be led by experts in their fields, and will discuss integrated construction approaches in an interactive format, considering viewpoints of all workshop participants. To capitalize on the growing interest in modular building, the workshop will be held in conjunction with the 2012 Modular and Off-site Construction Summit (November 8-9th) in Edmonton, Alberta, Canada.
Programme
Strategic Workshops Program
Bénéficiaire
Emplacement
Alberta, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
436609-2012
Name nom
AlHussein, Mohamed
Department département
Civil and Environmental Engineering
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2012
Competition year année de concours
2012
Award amount
25000
Program id
STPWS
Program name en
Strategic Workshops Program
Program name fr
Programme d'ateliers stratégiques
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1555
Committee name en
Prairie Internal Decision Committee
Committee name fr
Comité de décision interne pour les Prairies
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Partie
1
Nb partie
1
Application title
Integrated Modular and Offsite Construction Approaches: Architectural Design and Project Procurement & Financing Workshop
Keyword
NSERC
Application summary
The current on-site stick-built construction process is hampered by inefficiency, material/energy waste, a large carbon footprint, and health repercussions for workers and building residents. In contrast, industrialization in building construction reduces costs and construction time, generates higher quality products, and creates healthier environments for workers and occupants. Ultimately, replacing on-site building with modular and off-site construction will increase productivity and flexibility of the building manufacturing system, automate design and drafting for manufacturing (DDFM), optimize material usage/minimize waste, and decrease environmental footprint (CO2 emissions). Although many entities can benefit from industrialized building, including owners (private and public sector), institutions (schools and hospitals), general contractors, and architectural/engineering organizations, increased communication and collaboration is required to realize these benefits fully. As modular and off-site technology continues to evolve, the need to inform and engage all project stakeholders in every phase of the project grows increasingly relevant. To address this need, the proposed workshop will function as a networking event, involving the construction industry, public sector, and academic community in a productive dialogue about the potential and current limitations of modular and off-site construction. More specifically, the workshop will focus on two topics: 1) Architectural Design Integration Paradigm and 2) Project Procurement & Financing. Both topics will be led by experts in their fields, and will discuss integrated construction approaches in an interactive format, considering viewpoints of all workshop participants. To capitalize on the growing interest in modular building, the workshop will be held in conjunction with the 2012 Modular and Off-site Construction Summit (November 8-9th) in Edmonton, Alberta, Canada.