Grant: Engage Grants Program
École Polytechnique de Montréal
$25,000.00
Performance Validation of a New Centralized Disturbance Detection
EF 2015-16
Résumé
Smart distribution networks are emerging systems to integrate distributed generation into the power grid and
allow the clients to participate in energy market. In the near future, distribution networks will utilize
communication and control systems to efficiently manage energy distribution. In accordance with this prospect,
the industrial partner of this project, Vizimax Inc., has established a long-term strategy aiming at finding
effective solutions for reliable and autonomous operation of smart grids. The fast detection of disturbances is a
pivotal challenge for improving the reliability of smart grid which is one of the main goals established by the
industrial partner.
This six-month project focuses on the implementation of a new disturbance detection structure based on
synchrophasor data. The synchrophasor data are provided by particular devices called phasor measurement
units (PMUs). The proposed structure combined with the central controller facilitate fast detection as well as
accurate elimination of disturbances. Therefore, the present project paves the way for reliable operation of
smart microgrids. From the economical vantage point, this project contributes to higher efficiency at the system
level as well as improved power quality at a low cost.
The main focus of this project will be the development and implementation of algorithms for centralized
disturbance detection in smart grids. To this end, the following steps will be taken: 1) Real-time assessment of
voltage and frequency deviations, 2) Assessing reliability and robustness of detector with specified
performance specifications, 3) Addressing issues related to implementation of the central disturbance detector,
e.g., loss of synchrophasor data due to PMU failure and measurement noises.
The successful completion of the proposed project will demonstrate our ability in carrying out state-of-the-art
research and will establish a prosperous cooperation between Vizimax and my research team.
Programme
Engage Grants Program
Bénéficiaire
Emplacement
Quebec, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
488749-2015
Name nom
Karimi, Houshang
Department département
Génie électrique
Organization id
64
Institution établissement
École Polytechnique de Montréal
Province en
Québec
Province fr
Québec
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2015
Competition year année de concours
2015
Award amount
25000
Program id
EGP
Program name en
Engage Grants Program
Program name fr
Programme de subventions d'engagement partenariat
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
1552
Committee name en
Quebec Internal Decision Committee
Committee name fr
Comité de décision interne pour le Québec
Area of application code
304
Area of application group en
Energy resources
Area of application group fr
Ressources d'énergie
Area of application en
Electrical energy
Area of application fr
Énergie électrique
Research subject code
2500
Research subject group en
Electrical and electronic engineering
Research subject group fr
Génie électrique et électronique
Research subject en
Electrical and electronic engineering
Research subject fr
Génie électrique et électronique
Partie
1
Nb partie
1
Application title
Performance Validation of a New Centralized Disturbance Detection
Keyword
NSERC
Application summary
Smart distribution networks are emerging systems to integrate distributed generation into the power grid and
allow the clients to participate in energy market. In the near future, distribution networks will utilize
communication and control systems to efficiently manage energy distribution. In accordance with this prospect,
the industrial partner of this project, Vizimax Inc., has established a long-term strategy aiming at finding
effective solutions for reliable and autonomous operation of smart grids. The fast detection of disturbances is a
pivotal challenge for improving the reliability of smart grid which is one of the main goals established by the
industrial partner.
This six-month project focuses on the implementation of a new disturbance detection structure based on
synchrophasor data. The synchrophasor data are provided by particular devices called phasor measurement
units (PMUs). The proposed structure combined with the central controller facilitate fast detection as well as
accurate elimination of disturbances. Therefore, the present project paves the way for reliable operation of
smart microgrids. From the economical vantage point, this project contributes to higher efficiency at the system
level as well as improved power quality at a low cost.
The main focus of this project will be the development and implementation of algorithms for centralized
disturbance detection in smart grids. To this end, the following steps will be taken: 1) Real-time assessment of
voltage and frequency deviations, 2) Assessing reliability and robustness of detector with specified
performance specifications, 3) Addressing issues related to implementation of the central disturbance detector,
e.g., loss of synchrophasor data due to PMU failure and measurement noises.
The successful completion of the proposed project will demonstrate our ability in carrying out state-of-the-art
research and will establish a prosperous cooperation between Vizimax and my research team.