Grant: Collaborative Research and Development Grants
University of Alberta
$50,000.00
Development of an automated onsite crane management system for heavy industrial projects
EF 2016-17
Résumé
Heavy industrial construction companies have used the modular construction method to achieve high efficiency and mitigate the effects of Canada's harsh climate. Currently, heavy lifts in industrial projects are performed by large-capacity mobile cranes, the set-up and mobilization of which can cost millions of dollars per year. In order to improve planning efficiency, Advanced Crane Planning and Optimization (ACPO), an in-house crane management and planning system, has been developed. This system serves to: (i) select crane locations and check lift feasibility; (ii) directly reduce design and planning time for the engineering department; and (iii) help to eliminate human error involved in planning. In order to realize further improvements, this proposed research aims to continue to build on this system by: (i) developing a decision support system for preliminary crane selection based on site conditions and lifted module information; and (ii) integrating the previously developed path planning system with an in-house server database. Research activities will include: (i) crane location selection; (ii) crane lift path checking; (iii) crane configuration selection; (iv) heavy lift study and analysis; and (v) 3D modelling and simulation. This proposed research project aims to provide a data-driven construction management solution that will improve the productivity of the design, planning, and decision making processes of heavy industrial projects. The enhanced systems will directly reduce the design and planning time for the partner's engineering department, and can help to eliminate the human error involved in planning. The developed system can also optimize the crane locations and ensure that the optimal crane configuration is selected for the job in order to minimize mobile crane movement on construction sites. Furthermore, the faster construction process can lead to a reduction in CO2 emissions. Ultimately, planning heavy lifts more efficiently and accurately also helps to eliminate the guesswork and potential hazards of crane use.
Programme
Collaborative Research and Development Grants
Bénéficiaire
Emplacement
Alberta, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
491811-2015
Name nom
Bouferguene, Ahmed
Department département
Campus Saint-Jean
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2016
Competition year année de concours
2015
Award amount
50000
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Partie
1
Nb partie
1
Application title
Development of an automated onsite crane management system for heavy industrial projects
Keyword
NSERC
Application summary
Heavy industrial construction companies have used the modular construction method to achieve high efficiency and mitigate the effects of Canada's harsh climate. Currently, heavy lifts in industrial projects are performed by large-capacity mobile cranes, the set-up and mobilization of which can cost millions of dollars per year. In order to improve planning efficiency, Advanced Crane Planning and Optimization (ACPO), an in-house crane management and planning system, has been developed. This system serves to: (i) select crane locations and check lift feasibility; (ii) directly reduce design and planning time for the engineering department; and (iii) help to eliminate human error involved in planning. In order to realize further improvements, this proposed research aims to continue to build on this system by: (i) developing a decision support system for preliminary crane selection based on site conditions and lifted module information; and (ii) integrating the previously developed path planning system with an in-house server database. Research activities will include: (i) crane location selection; (ii) crane lift path checking; (iii) crane configuration selection; (iv) heavy lift study and analysis; and (v) 3D modelling and simulation. This proposed research project aims to provide a data-driven construction management solution that will improve the productivity of the design, planning, and decision making processes of heavy industrial projects. The enhanced systems will directly reduce the design and planning time for the partner's engineering department, and can help to eliminate the human error involved in planning. The developed system can also optimize the crane locations and ensure that the optimal crane configuration is selected for the job in order to minimize mobile crane movement on construction sites. Furthermore, the faster construction process can lead to a reduction in CO2 emissions. Ultimately, planning heavy lifts more efficiently and accurately also helps to eliminate the guesswork and potential hazards of crane use.