Grant: Collaborative Research and Development Grants
University of Alberta
$40,000.00
Evaluation and optimization of the integrity of HDD installed pipelines
EF 2018-19
Résumé
Horizontal Directional Drilling (HDD) is used to install pipelines and utilities beneath waterbodies, roads, and other surface obstacles where traditional open-cut construction is not feasible. The HDD process includes drilling a borehole along a pre-determined alignment, enlarging the borehole, and installing the pipeline by pulling it inside the borehole. The pipe being installed is subjected to a complex combination of stresses and strains that are not well understood. The stresses/strains that develop during installation have an impact on lifetime of the pipe operation. A more detailed investigation of the HDD installation requires evaluating axial and circumferential stresses, as well as the imposed strain on the pipe section as it is forced to conform to the borehole geometry. This research will include the analysis of stress/strain experienced by the pipe based on strain gauge measurements during actual HDD installations to evaluate the structural safety of pipelines.*This research program will use a strain-measurement tool to record longitudinal and circumferential strains throughout the pipe installation under various conditions and different pipe sizes. This data will be analyzed to calculate axial, bending, hoop, thermal, and shear stress. These findings will be compared with theoretical calculations recommended by current industry standards. This analysis will provide a basis to investigate the application of more recent and advanced design codes for HDD installed pipelines, and identify any areas that may improve the current design guidelines. The stress/strain analysis will also include pipe lifting operations while the pipe section is being lifted and aligned with the borehole. A separate strain monitoring system will be conducted to measure the actual pipe strain where the pipe bends vertically, horizontally, and sometimes a combination of the two. Finite Element (FE) models will also be developed to be compared against the actual measurements. These models will be verified against field measurements, and the modeling input parameters will be calibrated. These calibrated parameters will be the basis for future models and designs.
Programme
Collaborative Research and Development Grants
Bénéficiaire
Emplacement
Alberta, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data
Tel que publié
Application id
514954-2017
Name nom
Bayat, Alireza
Department département
Civil and Environmental Engineering
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2018
Competition year année de concours
2017
Award amount
40000
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
1206
Area of application group en
Advancement of knowledge
Area of application group fr
Avancement des connaissances
Area of application en
Engineering
Area of application fr
Génie
Research subject code
1002
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Geotechnical engineering (including engineering geology)
Research subject fr
Géotechnique (y compris génie géologique)
Partie
2
Nb partie
2
Application title
Evaluation and optimization of the integrity of HDD installed pipelines
Keyword
NSERC
Application summary
Horizontal Directional Drilling (HDD) is used to install pipelines and utilities beneath waterbodies, roads, and other surface obstacles where traditional open-cut construction is not feasible. The HDD process includes drilling a borehole along a pre-determined alignment, enlarging the borehole, and installing the pipeline by pulling it inside the borehole. The pipe being installed is subjected to a complex combination of stresses and strains that are not well understood. The stresses/strains that develop during installation have an impact on lifetime of the pipe operation. A more detailed investigation of the HDD installation requires evaluating axial and circumferential stresses, as well as the imposed strain on the pipe section as it is forced to conform to the borehole geometry. This research will include the analysis of stress/strain experienced by the pipe based on strain gauge measurements during actual HDD installations to evaluate the structural safety of pipelines.*This research program will use a strain-measurement tool to record longitudinal and circumferential strains throughout the pipe installation under various conditions and different pipe sizes. This data will be analyzed to calculate axial, bending, hoop, thermal, and shear stress. These findings will be compared with theoretical calculations recommended by current industry standards. This analysis will provide a basis to investigate the application of more recent and advanced design codes for HDD installed pipelines, and identify any areas that may improve the current design guidelines. The stress/strain analysis will also include pipe lifting operations while the pipe section is being lifted and aligned with the borehole. A separate strain monitoring system will be conducted to measure the actual pipe strain where the pipe bends vertically, horizontally, and sometimes a combination of the two. Finite Element (FE) models will also be developed to be compared against the actual measurements. These models will be verified against field measurements, and the modeling input parameters will be calibrated. These calibrated parameters will be the basis for future models and designs.