Grant: Collaborative Research and Development Grants

Concordia University

$34,782.00

Improving design and scheduling process for prefabrication of light gauge steel (LGS) panelized walls

EF 2018-19

Résumé
The modular (off-site or prefabricated) construction industry is becoming more widely recognized for its environmentally-friendly construction process, speed of construction, and waste reduction at cost-competitive prices. In this respect, modular construction provides a high level of construction flexibility, such that wall, floor, and roof panels or components (units or containers), based on project requirements. To capitalize on these benefits, modular construction companies need to develop well-organized scheduling for both offsite manufacturing and on-site operations. Such measures allow modular builders to continuously improve their production processes without sacrificing safety. To increase productivity by eliminating process waste, production processes, facility layout, workforce management, and material handling can be redesigned using various tools such as lean, simulation, and visualization. In addition, a well-built design system (i.e., workplace and drafting) can reduce not only the risk of injury, thereby boosting the efficiency of the construction process through improved safety, but also waste (e.g., material waste and non-value-added activities) leading to improve the productivity of the factory line. However, due to the lack of modular-based management systems, many manufacturing construction companies have the following challenges: (1) a wide variation in task durations; (2) overproduction and unbalance on the production line; and (3) a variation of worker performance at each station. To overcome these challenges, the research team expects the following benefits: (1) productivity improvement by developing a daily-based production scheduling system, which integrates the concepts of the continuous and pull flow with simulation and optimization in order to manage the production process and resources; (2) waste reduction by developing a modular-oriented intelligent design system; and (3) improved worker performance by designing an industrial hygiene model, mainly focused on designing task procedures and workplace, based on noise and ergonomic analyses.
Programme
Collaborative Research and Development Grants
Bénéficiaire
Emplacement
Quebec, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
522018-2017
Name nom
Han, SangHyeok
Department département
Building, Civil and Environmental Engineering
Organization id
70
Institution établissement
Concordia University
Province en
Québec
Province fr
Québec
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2018
Competition year année de concours
2017
Award amount
34782
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
603
Area of application group en
Construction, urban and rural planning
Area of application group fr
Construction, urbanisme et aménagement rural
Area of application en
Construction methods
Area of application fr
Méthodes de construction
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Partie
1
Nb partie
1
Application title
Improving design and scheduling process for prefabrication of light gauge steel (LGS) panelized walls
Keyword
NSERC
Application summary
The modular (off-site or prefabricated) construction industry is becoming more widely recognized for its environmentally-friendly construction process, speed of construction, and waste reduction at cost-competitive prices. In this respect, modular construction provides a high level of construction flexibility, such that wall, floor, and roof panels or components (units or containers), based on project requirements. To capitalize on these benefits, modular construction companies need to develop well-organized scheduling for both offsite manufacturing and on-site operations. Such measures allow modular builders to continuously improve their production processes without sacrificing safety. To increase productivity by eliminating process waste, production processes, facility layout, workforce management, and material handling can be redesigned using various tools such as lean, simulation, and visualization. In addition, a well-built design system (i.e., workplace and drafting) can reduce not only the risk of injury, thereby boosting the efficiency of the construction process through improved safety, but also waste (e.g., material waste and non-value-added activities) leading to improve the productivity of the factory line. However, due to the lack of modular-based management systems, many manufacturing construction companies have the following challenges: (1) a wide variation in task durations; (2) overproduction and unbalance on the production line; and (3) a variation of worker performance at each station. To overcome these challenges, the research team expects the following benefits: (1) productivity improvement by developing a daily-based production scheduling system, which integrates the concepts of the continuous and pull flow with simulation and optimization in order to manage the production process and resources; (2) waste reduction by developing a modular-oriented intelligent design system; and (3) improved worker performance by designing an industrial hygiene model, mainly focused on designing task procedures and workplace, based on noise and ergonomic analyses.