Canada Spends Logo

Explorez notre analyse du budget 2026

Grant: Collaborative Research and Development Grants

University of Alberta

$80,000.00

Improvement of offsite light gauge steel (LGS) construction operations using BIM and target cost analysis

EF 2015-16

Résumé
Offsite construction is increasingly adopted in Canada's construction industry, bringing the benefits of reduced construction waste and improved productivity. However, the current tools and management systems within the construction industry are not suited to directly serve this newly adopted approach. In this regard, Fortis LGS Structures Inc. is collaborating with the University of Alberta to develop specific tools for their offsite construction operations. Fortis is an Edmonton-based residential builder focusing on a panelized construction approach whereby components such as walls are prefabricated in a factory and delivered to the site for installation. Four tasks are proposed for this CRD program: (i) to develop a Building Information Modelling (BIM) system that can automatically perform the quantity take-off, based upon which construction schedules can be planned and daily updates can be achieved; (ii) to apply target cost analysis to compare designs based on BIM models; (iii) to develop an integrated management framework for panelized construction applying lean principles; and (iv) to find a hybrid structure design method that can be used as a benchmark for Fortis's high-rise residential projects. This research project will benefit Canada in the following aspects: (i) the proposed research will establish a framework for improving productivity for modularized/panelized construction, which can be achieved by applying lean manufacturing principles and implementing BIM tools to automate the design and drafting process; and (ii) the proposed research will form a management system that is suitable to the modularized/panelized construction industry, which optimizes material usage and mitigates carbon emissions.
Programme
Collaborative Research and Development Grants
Bénéficiaire
Emplacement
Alberta, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
469918-2014
Name nom
AlHussein, Mohamed
Department département
Civil and Environmental Engineering
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2015
Competition year année de concours
2014
Award amount
80000
Program id
CRDPJ
Program name en
Collaborative Research and Development Grants
Program name fr
Subventions de recherche et développement coopérative
Group en
Research partnerships programs
Group fr
Programmes de partenariat
Committee code
96
Committee name en
RPP Internal Decision Cttee
Committee name fr
Cté de décision interne - PPR
Area of application code
500
Area of application group en
Manufacturing processes and products
Area of application group fr
Procédés et produits industriels
Area of application en
Manufacturing processes and products
Area of application fr
Procédés et produits industriels
Research subject code
1001
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Construction engineering and management
Research subject fr
Génie et gestion du bâtiment
Partie
2
Nb partie
3
Application title
Improvement of offsite light gauge steel (LGS) construction operations using BIM and target cost analysis
Keyword
NSERC
Application summary
Offsite construction is increasingly adopted in Canada's construction industry, bringing the benefits of reduced construction waste and improved productivity. However, the current tools and management systems within the construction industry are not suited to directly serve this newly adopted approach. In this regard, Fortis LGS Structures Inc. is collaborating with the University of Alberta to develop specific tools for their offsite construction operations. Fortis is an Edmonton-based residential builder focusing on a panelized construction approach whereby components such as walls are prefabricated in a factory and delivered to the site for installation. Four tasks are proposed for this CRD program: (i) to develop a Building Information Modelling (BIM) system that can automatically perform the quantity take-off, based upon which construction schedules can be planned and daily updates can be achieved; (ii) to apply target cost analysis to compare designs based on BIM models; (iii) to develop an integrated management framework for panelized construction applying lean principles; and (iv) to find a hybrid structure design method that can be used as a benchmark for Fortis's high-rise residential projects. This research project will benefit Canada in the following aspects: (i) the proposed research will establish a framework for improving productivity for modularized/panelized construction, which can be achieved by applying lean manufacturing principles and implementing BIM tools to automate the design and drafting process; and (ii) the proposed research will form a management system that is suitable to the modularized/panelized construction industry, which optimizes material usage and mitigates carbon emissions.