Canada Spends Logo

Explorez notre analyse du budget 2026

Grant: Discovery Grants Program - Individual

University of Alberta

$20,000.00

Development of next-generation methodologies of resource scheduling, augmented reality visualization, and resource tracking for construction project management

EF 2011-12

Résumé
4D modeling (3D CAD plus time) and building information modeling (BIM) technologies will turn mainstream in the construction industry in the foreseeable future. Yet, their application effectiveness in construction engineering largely hinges on development of cost-effective, dynamic-data-driven methodologies for scheduling, tracking, and visualizing construction resources. In order to cater for application needs in planning and control of construction projects, the present research is intended to develop next-generation methodologies for scheduling, tracking, positioning, real-time 3D modeling of critical construction resources on site, including heavy equipment, materials, laborers and tools. This research is proposed based on the PI's previous research achievements in (1) advancing critical path method for construction scheduling; (2) applying robotic total station to track and position tunnel boring machine during microtunneling and pipe-jacking; and (3) utilizing digital camera and photogrammetry to realize augmented reality (AR) visualization for subsurface infrastructure construction. The research will combine various real-time computing analyses with advanced technologies for surveying automation and data communications. It is anticipated (1) the resulting resource scheduling analysis will address fundamental limitations inherent in established project scheduling methodologies; (2) implementation of the resource allocation plan derived from scheduling analysis can be closely monitored and dynamically adjusted to actual site situations; and (3) the state of resource deployment and utilization can be mapped in AR visualization in real time- which is also instrumental in improving efficiency, safety, and job costing onsite. With this grant, the PI will leverage existing strengths and contribute to establishing a more broadly based construction research program at the U of A. In the long run, this research will lay a solid foundation for future development and deployment of an engineering-analysis-integrated, dynamic-data-driven platform for construction engineering and project management.
Programme
Discovery Grants Program - Individual
Bénéficiaire
Emplacement
Alberta, Canada
Type de bénéficiaire
Academia
Type
Grant
Source
NSERC's Awards Data

Tel que publié

Application id
405636-2011
Name nom
Lu, Ming
Department département
Civil and Environmental Engineering
Organization id
9
Institution établissement
University of Alberta
Province en
Alberta
Province fr
Alberta
Country en
CANADA
Country fr
CANADA
Fiscal year exercice financier
2011
Competition year année de concours
2011
Award amount
20000
Program id
RGPIN
Program nane en
Discovery Grants Program - Individual
Program name fr
Programme de subventions à la découverte - individuelles
Group en
Discovery grants programs
Group fr
Programmes de subventions à la découverte
Committee code
1509
Committee name en
Civil, Industrial and Systems Engineering
Committee name fr
Génie civil, industriel et des systèmes
Area of application code
1200
Area of application group en
Advancement of knowledge
Area of application group fr
Avancement des connaissances
Area of application en
Advancement of knowledge
Area of application fr
Avancement des connaissances
Research subject code
1000
Research subject group en
Civil engineering
Research subject group fr
Génie civil
Research subject en
Civil engineering
Research subject fr
Génie civil
Partie
1
Nb partie
5
Application title
Development of next-generation methodologies of resource scheduling, augmented reality visualization, and resource tracking for construction project management
Keyword
NSERC
Application summary
4D modeling (3D CAD plus time) and building information modeling (BIM) technologies will turn mainstream in the construction industry in the foreseeable future. Yet, their application effectiveness in construction engineering largely hinges on development of cost-effective, dynamic-data-driven methodologies for scheduling, tracking, and visualizing construction resources. In order to cater for application needs in planning and control of construction projects, the present research is intended to develop next-generation methodologies for scheduling, tracking, positioning, real-time 3D modeling of critical construction resources on site, including heavy equipment, materials, laborers and tools. This research is proposed based on the PI's previous research achievements in (1) advancing critical path method for construction scheduling; (2) applying robotic total station to track and position tunnel boring machine during microtunneling and pipe-jacking; and (3) utilizing digital camera and photogrammetry to realize augmented reality (AR) visualization for subsurface infrastructure construction. The research will combine various real-time computing analyses with advanced technologies for surveying automation and data communications. It is anticipated (1) the resulting resource scheduling analysis will address fundamental limitations inherent in established project scheduling methodologies; (2) implementation of the resource allocation plan derived from scheduling analysis can be closely monitored and dynamically adjusted to actual site situations; and (3) the state of resource deployment and utilization can be mapped in AR visualization in real time- which is also instrumental in improving efficiency, safety, and job costing onsite. With this grant, the PI will leverage existing strengths and contribute to establishing a more broadly based construction research program at the U of A. In the long run, this research will lay a solid foundation for future development and deployment of an engineering-analysis-integrated, dynamic-data-driven platform for construction engineering and project management.